Permit NumberESC13-01127
StatusFinaled
Name ROB HADDOCK
Site Address 5390 N MORNINGGALE WAY
Project NamePettey Home
Customer Number 
ePlanReviewNo
Description
Per the attached ESC conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection9/19/20149/19/20149/19/2014 PASS
DetailsAndy J. Long
Home complete and occupied. Building materials and construction related sediment had been swept. Homeowner working on some irrigation issues so a little dirt on the sidewalk will need to be swept.

ESC conditions satisfied by builder.
DOC - Permit Finaled9/19/20149/19/20149/19/2014PPASS
DetailsAndy J. Long
Site Preparation1/23/20141/24/20141/24/2014APASS
DetailsEvan Jenkins
rob Phone #: ###-####
Stop Work Order Removed. Corrections have been made.
BMP Violation1/22/20141/23/20141/23/2014PFAIL
DetailsEvan Jenkins
Stop Work Order has been Issued: No Work to be done onsite until Violations have been addressed.
BMP Violation1/21/20141/22/20141/22/2014PFAIL
DetailsEvan Jenkins
Correction Notice Posted for multiple BMP violations. Attempted calling RP and left a message with secretary disclosing the multiple violations and to get project back in compliance. Street was swept and sidewalk, but still significant amount of sediment still in ROW and sidewalk. Contractor incorrectly installed damaged Gator-Guard infront of site. Not doing any good. No staked down, nor back filled. Concrete washed out on ground in SW corner of site. No Debris was picked up. Called again, LAST WARNING Prior to stop work order issuence. Will reinspect again tomorrow 1-23-13 at 12:00pm.
BMP Violation1/21/20141/21/20141/21/2014AFAIL
DetailsEvan Jenkins
ACHD Stormwater Complaint
Correction Notice Posted: ACHD Issued a Notice of Violation:
-Install Construction Entrance, Install Perimeter BMP's, Sweep ACHD ROW and Sidewalk, Remove Porta-Pot from ACHD Sidwalk (Causing Obstruction), Cleanup scattered Debris throughout Project.
Attempted to call RP Rob Haddock 2869456, got ahold of secretary. Disclosed to her for Rob to call me back ASAP and address multiple BMP violations and have the issues address/fixed by 1-22-14 by 12:00pm or a Stop Work Order shall be issued along with potential Civil Penalties. She stated she will get people out righ away to begin cleanup and address BMP violations. Will reinspect tomorrow 1-22-14 at 12:00pm to ensure contractor is back in compliance
Site Preparation12/2/201312/2/201312/2/2013PPASS
DetailsJim Sly