Aging Inspection | 8/1/2014 | 8/1/2014 | 8/1/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 8/1/2014 | 8/1/2014 | 8/1/2014 | P | PASS |
Andy J. Long
|
|
|
Home is complete and landscaped. ESC permit conditions have been satisfied.
|
Random Inspection | 4/4/2014 | 4/4/2014 | 4/4/2014 | P | FAIL |
Andy J. Long
|
|
|
Concrete being poured for foundation. Trucks are using designated washout but tracking mud clods down alley and street.
Verbal warning issued to Brighton Homes RP Josh Edwards via phone to have crew clean up once concrete is poured.
|
Site Preparation | 1/9/2014 | 1/10/2014 | 1/10/2014 | A | PASS |
Andy J. Long
|
|
|
Permit is posted. Drop inlets protected. Wattles along alley are installed but may be removed during loading/unloading equipment onto lot. Approved for construction.
|