Site Final | 10/10/2014 | 10/13/2014 | 10/13/2014 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 9/17/2014 | 9/19/2014 | 9/18/2014 | A | PASS |
Andy J. Long
|
|
|
WIP on the interior. The home is already landscaped/stabilized. Need to do final site cleanup and construction material removal- minor sweeping in gutter.
|
Aging Inspection | 9/17/2014 | 9/17/2014 | 9/17/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled to 9/18 due to ESC conference
|
Aging Inspection | 7/18/2014 | 7/18/2014 | 7/18/2014 | | PASS |
Evan Jenkins
|
|
|
work in progress no esc issues at time of inspection site is clean
|
Site Preparation | 11/25/2013 | 11/26/2013 | 11/26/2013 | A | PASS |
Andy J. Long
|
|
|
RICK Phone #: ###-####
Contractor on site. Washout onsite in garage addition. Vegtation on both sides; flat infill lot. Tracking control and daily housekeeping required as needed.
|