Permit Information
Permit NumberESC13-01191
StatusFinaled
Name MARK GUHO
Site Address 3003 W MAIN ST
Project Name30th + Main
Customer Number 
ePlanReviewNo
Description
New 2 story office building and site improvements
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection2/2/20152/2/20152/2/2015 PASS
DetailsEvan Jenkins
DOC - Permit Finaled2/2/20152/2/20152/2/2015PPASS
DetailsEvan Jenkins
Building is complete
vegetation re-established via landscaping/sod
requirements me
General Inspection1/16/20151/16/20151/16/2015 PASS
DetailsEvan Jenkins
Project near completion. Just a small amount of perminant stabilization needs to take place. Permit will most likely be closed at next inspection
General Inspection1/1/20151/1/20151/2/2015 PASS
DetailsAndy J. Long
WIP. Site is in process of being landscaped but is currently on hold due to below freezing weather. No trackout or ESC violations observed.
General Inspection12/17/201412/17/201412/17/2014 PASS
DetailsEvan Jenkins
Interior is almost completely paved with landscaping currently taking place. Only other work occuring is inside the building.
No ESC issues at this time
General Inspection12/2/201412/2/201412/2/2014 PASS
DetailsEvan Jenkins
Interior work only at time of inspection. No esc issues at this time. near completion
General Inspection11/17/201411/17/201411/17/2014 PASS
DetailsAndy J. Long
Building frame is complete as well as parking lot curbing/parking stalls. No trackout to Whitewater Blvd or Main Street. ESC permit posted on chain link security fence. No corrections needed at this time. WIP.
General Inspection10/31/201410/31/201410/31/2014 PASS
DetailsEvan Jenkins
no issues observed. site has been in good shape since the start
General Inspection10/16/201410/16/201410/16/2014 PASS
DetailsEvan Jenkins
Building is near completion
No ESC Issues at this time. BMP's still in place and Permit still posted along Main St.
General Inspection10/1/201410/1/201410/1/2014 PASS
DetailsEvan Jenkins
no esc issues at this time
General Inspection9/16/20149/16/20149/16/2014 PASS
DetailsEvan Jenkins
no esc issues
site has been very well taken care of throughout construction
General Inspection8/29/20148/29/20148/29/2014 PASS
DetailsEvan Jenkins
site is in good shape
no esc issues at time of inspection
General Inspection8/14/20148/14/20148/14/2014 PASS
DetailsEvan Jenkins
General Inspection7/30/20147/30/20147/30/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
General Inspection7/15/20147/15/20147/15/2014 PASS
DetailsEvan Jenkins
very minimal trackout. a worker was currently sweeping it up while I was inspecting
General Inspection6/27/20146/27/20146/27/2014 PASS
DetailsEvan Jenkins
site is in good shape at time of inspection
General Inspection6/12/20146/12/20146/12/2014 PASS
DetailsEvan Jenkins
no issues at time of inspection
General Inspection5/28/20145/28/20145/28/2014 PASS
DetailsAndy J. Long
WIP. Building frame is erected. Keeping construction activities and sediment well within site perimeter fencing with existing stabilized areas maintain. Contruction entrance is now on Whitewater Blvd.

No corrections required.
General Inspection5/13/20145/13/20145/13/2014 PASS
DetailsEvan Jenkins
General Inspection4/24/20144/24/20144/24/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
General Inspection4/9/20144/9/20144/9/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection
Talked with Contractor and he stated the Construction Signage blew away in the last wind storm. I gave him a new sign to post
General Inspection3/20/20143/20/20143/20/2014 PASS
DetailsAndy J. Long
Perimeter BMPs and construction entrance preventing sediment migration and track out to Main.
General Inspection3/5/20143/5/20143/5/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection