Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC13-01194
StatusFinaled
Name KEITH DRAPER
Site Address 1075 E PARK BLVD
Project NameBoise State University
Customer Number 
ePlanReviewNo
Description
per attached conditions.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/25/20148/25/20148/25/2014 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled8/25/20148/25/20148/25/2014PPASS
DetailsAndy J. Long
Project complete. No construction and stockpile mentioned in previous inspections has been removed and area swept. ESC conditions satisfied.
General Inspection6/23/20146/23/20146/23/2014 PART
DetailsEvan Jenkins
Called RP Keith Draper and left VM to disclose the same information Andy stated in the prevoius inspection. Small stockpile needs to be removed, and small area needs to be swept prior to this permit being closed.
General Inspection4/23/20144/23/20144/23/2014 PART
DetailsAndy J. Long
Construction appears to be complete. BLD permit is open. There is a small stockpile of dirt and concrete aggregate in rear parking lot that needs to be removed and the parking lot area directly south needs manual sweeping.
BMP Violation2/19/20142/19/20142/19/2014PPASS
DetailsAndy J. Long
Follow up inspection on CN to remove uncontained stockpile. Stockpile was removed and area was swept. Site is now in compliance.
Conference2/14/20142/14/20142/14/2014ADONE
DetailsAndy J. Long
RP returned call. The stockpile was left onsite due to the excavator going to the hospital. Draper Construction will haul stockpile away today and take to their construction yard. They will also sweep up the site.

Will reinspect at end of day or Tuesday 2/18.
BMP Violation2/14/20142/14/20142/14/2014PFAIL
DetailsAndy J. Long
Uncontained stockpile on pavement parking lot. Close to sidewalk and gutter, though sheet flow goes to drainage swale.. Close proximity to Boise River. No DI bag on downstream MS4. No sediment discharge at this time, but if rain continues it could occur.

Verbal correction notice issued to RP Keith via voicemail. Will conduct follow up call and inspection next week.
General Inspection1/24/20141/24/20141/24/2014 PASS
DetailsAndy J. Long
Building rennovation has started. New utility trench was being installed with workers keeping dirt off sidewalk and street. No corrections at this time.