General Inspection | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | PASS |
Andy J. Long
|
|
|
Home is complete, BLD permit finaled, and parcel is landscaped. ESC permit condtions satisfied.
|
Aging Inspection | 8/22/2014 | 8/22/2014 | 8/22/2014 | | CANC |
Andy J. Long
|
|
|
Rescheduled for Monday 8/25
|
General Inspection | 4/7/2014 | 4/7/2014 | 4/7/2014 | A | PART |
Mike Jordan
|
|
|
Needs to sweep all hard surfaces of silts and pick up all construction debries. RP was notied.
|
Random Inspection | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 12/24/2013 | 12/26/2013 | 12/26/2013 | A | PASS |
Andy J. Long
|
|
|
james Phone #: ###-####
Conference with RP Jim regarding 7 adjacent new townhome lots in Pine Tree Village phase #5. Site has perimeter BMPs, central washout, and signage to keep sub-contractors/delivery service off mud. Advised routine sweeping and trash removal. Approved for construction; will excavate when weather permits.
|