Aging Inspection | 8/22/2014 | 8/22/2014 | 8/22/2014 | | PASS |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 8/22/2014 | 8/22/2014 | 8/22/2014 | P | PASS |
Evan Jenkins
|
|
|
Project complete Vegetation Re-established via landscaping/sod done
|
Random Inspection | 6/3/2014 | 6/3/2014 | 6/3/2014 | P | PASS |
Andy J. Long
|
|
|
No trackout. Needs landscaping and final cleanup. BLD permit already finaled.
|
Site Preparation | 1/6/2014 | 1/6/2014 | 1/6/2014 | P | PART |
Evan Jenkins
|
|
|
luke Phone #: ###-#### Construction Entrances needs to be extended Per BMP Field Guide legths and widths. Gator-Guard Perimeter controls need to be back filled
|
Site Preparation | 1/3/2014 | 1/3/2014 | 1/3/2014 | A | NR |
Evan Jenkins
|
|
|
Luke - Syringa Not Ready for Site Prep Inspection Talked with Luke onsite about posting construction sign, installing Perimeter BMP's and Construction Entrance. He stated he will do all of this, then call back in for a site prep inspection next week.
|