Site Final | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 5/11/2015 | 5/11/2015 | 5/11/2015 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Driveway and all adajecent lots already developed/stabilized. No ESC violations or issues.
|
Aging Inspection | 3/9/2015 | 3/9/2015 | 3/10/2015 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 1/6/2015 | 1/6/2015 | 1/6/2015 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Driveway already paved. No trackout or sediment in runoff from site.
|
Aging Inspection | 11/5/2014 | 11/5/2014 | 11/5/2014 | | PASS |
Andy J. Long
|
|
|
Student project house is still in progress. Frame up and siding is being put on. No trackout from vehicles or sediment leaving. Very clean. Permit posted on job trailer. Approved.
|
General Inspection | 9/5/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Andy J. Long
|
|
|
High school building project is in pregress with limited activity occuring at time of inspection. No sediment trackout or runoff. Trash is contained. Permit posted. Approved
|
Aging Inspection | 9/5/2014 | 9/5/2014 | 9/5/2014 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | PASS |
Andy J. Long
|
|
|
rescheduled from AM. James # ###-####
This house is Boise School District vocational project. Met teacher/RP James onsite with class and reviewed BMPs and daily housekeeping duties, and purpose of erosion control.
Ready for construction.
|
Site Preparation | 1/30/2014 | 1/31/2014 | 1/31/2014 | A | NR |
Andy J. Long
|
|
|
James Phone #: ###-####
Called RP to schedule, he is unable to meet until 1:40 PM. Site prep rescheduled.
|