DOC - Permit Finaled | 10/21/2014 | 10/21/2014 | 10/21/2014 | P | PASS |
Andy J. Long
|
|
|
Exterior complete and landscaped/stabilized. ESC conditions satisfied. BLD open for internal work. No ESC corrections required. Permit finaled.
|
Site Preparation | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PART |
Evan Jenkins
|
|
|
I missed calling this in earlier Phone #: ###-#### >> Inspection requested via web by Austin Wagner Foundation already poured prior to site prep inspection. Construction signage posted in front of lot
|