DOC - Permit Finaled | 3/19/2015 | 3/19/2015 | 3/19/2015 | A | PASS |
Andy J. Long
|
|
|
Pine Tree Village townhome complete, surrounding area landscaped and stabilized. Drop inlets on Pine Valley have been removed and loose sediment swept. ESC permit conditions satisfied.
|
Aging Inspection | 1/19/2015 | 1/19/2015 | 1/20/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Frame for building is up. No trackout on Pine Valley or Shoup. Debris and materials are contained. DI bags installed at Pine Tree Village. No corrections at this time.
|
Aging Inspection | 11/19/2014 | 11/19/2014 | 11/19/2014 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 | | PART |
Andy J. Long
|
|
|
Pinetree Village townhome WIP.
Verbal correction request to sweep/clean up waste construction materials along Shoup street was issued 9/18 and is to be completed by Monday.
|
Site Preparation | 2/26/2014 | 2/26/2014 | 2/26/2014 | P | PASS |
Mike Jordan
|
|
|
>> Inspection requested via web by James Larkin
|