Aging Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Andy J. Long
|
|
|
New infill home is complete, landscaped, and occupied. No outstanding ESC issues. BLD finaled.
|
Site Preparation | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PART |
Evan Jenkins
|
|
|
Luke Phone #: ###-#### Trench in waddles per manufactures spec. Install construction entrance per our (my discussion with Luke via cell) prior to my arrival for the site prep inspection. Luke ensured me that the construction entrance would be complete prior to my arrival, but the excavator was already digging down to elevation for foundation. I gave luke my last verbal warning for all Site Prep Inspections: "No Earth Disturbance to take place prior to an Approved Site Prep Insepction". This goes with ALL Syringa Construction Projects. Luke to call PDS to schedual a reinspection for tomorrow morning. If corrections not address/fixed, stop work order will be issued. Reinspection fee will be assessed.
|