Aging Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Andy J. Long
|
|
|
CBH project in Trailside Place II is complete. DI bags were recently maintained for remaining homesites to be developed.
All permits finaled. ESC conditions satisfied.
|
Site Preparation | 1/24/2014 | 1/24/2014 | 1/24/2014 | P | PASS |
Andy J. Long
|
|
|
Brett Phone #: ###-####
Met RP Brett on-site. Flat plot, low risk. Drop inlet protection provided and Trailside washout is in adjacent lot. Approved. Excavation to start Monday.
|