Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC14-00009
StatusFinaled
Name ERIC ALLEN
Site Address 2964 E WINDSONG DR
Project NameLot24 Blk1 Boulder Heights#5
Customer Number 
ePlanReviewNo
Description
JH development. Drainage channel behind homesite is to be re-graded, once grading complete it will be stabilized/protected. Any stockpiling onsite needs to have proper management or perimeter BMPs. No off street parking allowed. No material storage or loading on adjacent lots unless permitted.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/15/20148/15/20148/15/2014APASS
DetailsPhil Shearer
DOC - Permit Finaled8/15/20148/15/20148/15/2014PPASS
DetailsPhil Shearer
General Inspection8/1/20148/1/20148/1/2014 PASS
DetailsAndy J. Long
General Inspection7/1/20147/1/20147/1/2014 PASS
DetailsAndy J. Long
WIP. No trackout or hillside erosion observed. Site is clean with trash contained. Permit is posted. Approved.
General Inspection5/28/20145/28/20145/28/2014 PASS
DetailsAndy J. Long
WIP. No corrections at this time. Roofers on site and staying off open areas.
General Inspection4/23/20144/23/20144/23/2014 PASS
DetailsAndy J. Long
WIP. Some minor trackout from foot traffic. No corrections at this time.
Tracking Control3/21/20143/21/20143/21/2014PPASS
DetailsAndy J. Long
Follow up inpsection from previous day CN.

Temporary dirt ramp installed for backfilling loads has been removed and gutters and sidewalk have been cleaned as requested.
BMP Violation3/20/20143/20/20143/20/2014AFAIL
DetailsAndy J. Long
Non-compliant construction entrance for dirt hauling is causing trackout.

Corrections:
1. Clean up dirt on Windsong and dirt ramp in gutter.
2. Provide alternative access over curb
3. Re-install BMPs at top Windsong once loading operations are finished.
General Inspection3/6/20143/6/20143/6/2014 PART
DetailsAndy J. Long
Site was cleaned after foundation work. No vehicle trackout and sidewalk was swept. No work during the mud.

1 correction:
Provide concrete and liquid waste washout and removed pile of concrete in front of house.

Discussed issues with RP who will make corrections.
Site Preparation1/28/20141/29/20141/29/2014APASS
DetailsAndy J. Long
eric Phone #: ###-####

Site is ready for excavation. Extra wattles on-site to install once stock piling begins. Eric stated excavation will start this afternoon or tomorrow once rain has stopped.