Site Final | 9/22/2014 | 9/22/2014 | 9/22/2014 | P | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 9/22/2014 | 9/22/2014 | 9/22/2014 | P | PASS |
Phil Shearer
|
|
|
|
Site Preparation | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Andy J. Long
|
|
|
Adam Phone #: ###-####
Permit posted. Eaglewood RP on site and keeping site in compliance. Ready for excavation.
|