DOC - Permit Finaled | 9/11/2014 | 9/11/2014 | 9/11/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/11/2014 | 9/11/2014 | 9/11/2014 | | PASS |
Andy J. Long
|
|
|
BK west wing addition is complete. BLD permit finaled. ESC conditions satisfied, no further inspections required for this project, though there is other construction on BK campus. No violations observed.
|
General Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No sediment leaving site. Foundation and earthwork is complete. Vertical construction is in progress. Approved.
|
General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 | | PASS |
Andy J. Long
|
|
|
WIP on BK east wing addition. Swale across access lane from project area has wattle protection. Parking lot DI's have filter bags. Mostly interior work remains as well as exterior landscaping/stabilization. Currently in compliance.
|
General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 | | PASS |
Andy J. Long
|
|
|
Addition frame has been built. Interior work ongoing. Concurrent parking lot and tennis court project is covered under ESC13-01263. Sediment and construction materials confined to site. No corrections required.
|
General Inspection | 5/7/2014 | 5/7/2014 | 5/7/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/2/2014 | 4/2/2014 | 4/2/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues at time of inspection
|