Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC14-00039
StatusFinaled
Name MAGNUM CONTRACTORS
Site Address 409 S COLE RD
Project NameDemolition
Customer Number 
ePlanReviewNo
Description
Demolition of Plaza Hotel building - now owned by Larry Miller Auto Group. Post demolition, the area is to be resurfaced. ESC plan waiver submitted and approved. All ESC conditions still apply - see attached conditions. Downhill from Farmer's Lateral with vegetated barrier.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled6/18/20146/18/20146/18/2014PPASS
DetailsAndy J. Long
Demolition complete by Magnum Demo on this permit. Lot is not stabilized since it is now part of another project at the Boise Auto Mall/ Larry H. Miller dealerships. Magnum no longer on site. Inspection found trouble with another project on site:

At 10 AM this morning, the streets were cleaned improperly with a water truck after dirt dropped out of an end loader. Contractors on job STS and G&B were quick to install BMPs to prevent and filter discharge to MS4 using check dams and DI protection.

Mike from STF presented an temp approval from Josh Wilson (Planning) to work on temporary parking lot. The work will eventually be covered under ESC14-00300.