General Inspection | 9/1/2014 | 9/1/2014 | 9/3/2014 | | CANC |
Andy J. Long
|
|
|
holiday
|
General Inspection | 9/2/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Andy J. Long
|
|
|
Home construction is complete and yard is landscaped. ESC conditions satisfied. Downstream BMPs are to remain installed for other homes currently under construction in Somerset Ridge #5.
|
General Inspection | 8/1/2014 | 8/1/2014 | 8/1/2014 | | PASS |
Andy J. Long
|
|
|
Project is near completion. Yard is not yet landscaped and perimeter wattles installed. No corrections needed at this time.
|
General Inspection | 7/1/2014 | 7/1/2014 | 7/1/2014 | | PASS |
Evan Jenkins
|
|
|
hillsides are re-vegetating via previous hydroseed no esc issues at time of inspection
|
General Inspection | 5/28/2014 | 5/28/2014 | 5/28/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/19/2014 | 3/19/2014 | 3/19/2014 | | PASS |
Andy J. Long
|
|
|
Foundation has been poured. Permit posted. No trackout or sediment runoff. Somerset Ridge #5 was recently hydroseeded in surrounding areas.
|
Site Preparation | 2/13/2014 | 2/13/2014 | 2/13/2014 | P | PASS |
Andy J. Long
|
|
|
BMPs including perimeter wattles, downstream check dam, and construction entrance are installed. RP Larry ordered more rock as requested earlier in day. Permit sign will be posted tomorrow AM as agreed to. Approved.
|