DOC - Permit Finaled | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Andy J. Long
|
|
|
Hayden Home in Sunnyridge is complete and landscaped. ESC conditions satisfied. Black Gold Street has been swept regularly.
|
Random Inspection | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | PART |
Andy J. Long
|
|
|
Lots of work being conducted on multiple Hayden Homes projects.
Verbal CN to RP Rich Beaman to have sweeping service at end of the day or at the latest Thursday.
|
Site Preparation | 2/24/2014 | 2/25/2014 | 2/25/2014 | A | PASS |
Andy J. Long
|
|
|
rich Phone #: ###-####
Construction access for 3 adjacent lots on Black Gold St by Hayden Homes has been provided. Washout is across Snow Bird. Street sweeping by machine on Snow Bird and Black Gold will be managed by Rich. Permit posted. Approved.
|