DOC - Permit Finaled | 1/15/2016 | 1/15/2016 | 1/15/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 | | FAIL |
Andy J. Long
|
|
|
Need to change out DI bag that is receiving dirty sheet flow from the new phase of Cordillera. Need to sweep parking lots when conditions dry.
No active construction in this phase, no further inspections on this permit. See ESC15-00336 for active corrections. Same RP. This permit finaled.
|
General Inspection | 11/30/2015 | 11/30/2015 | 11/30/2015 | | PASS |
Evan Jenkins
|
|
|
Minor work in Progress. No ESC issues observed at this time.
|
General Inspection | 10/13/2015 | 10/13/2015 | 10/13/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 8/28/2015 | 8/28/2015 | 8/28/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/13/2015 | 7/13/2015 | 7/13/2015 | | PASS |
Evan Jenkins
|
|
|
Internal road has been paved along with some sidewalks poured. No issues at this time
|
General Inspection | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/26/2015 | 5/26/2015 | 5/26/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 4/10/2015 | 4/10/2015 | 4/10/2015 | | PASS |
Evan Jenkins
|
|
|
All 4-plexes complete and re-vegetated. Only work is being constructed is on the pool house. no esc issues at this time
|
General Inspection | 2/23/2015 | 2/23/2015 | 2/23/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no issues/violations at this time of inspection.
|
General Inspection | 1/6/2015 | 1/6/2015 | 1/6/2015 | P | PASS |
Andy J. Long
|
|
|
Site is in good condition. All 4 plex permits have been finaled, remaining landscaping will be covered on this permit.
The pool that will begin soon is on ESC14-01058 and the new phase application and SWPPP shall be submitted within 2 months and work in the spring.
No corrections at this time.
|
General Inspection | 1/5/2015 | 1/5/2015 | 1/5/2015 | | PASS |
Evan Jenkins
|
|
|
no esc issues at this time
|
General Inspection | 11/18/2014 | 11/18/2014 | 11/18/2014 | | CANC |
Andy J. Long
|
|
|
Cordillera site inspected previous day, no ESC issues reported. Frozen conditions continuing.
|
General Inspection | 10/3/2014 | 10/3/2014 | 10/3/2014 | | PASS |
Evan Jenkins
|
|
|
curtis clean sweep has addressed the tracking issues throughout the project. no other esc issues at this time.
|
General Inspection | 8/18/2014 | 8/18/2014 | 8/18/2014 | | PASS |
Evan Jenkins
|
|
|
verticle construction occuring no esc issues at this time
|
General Inspection | 7/1/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Andy J. Long
|
|
|
Cordillera 4-plexes. 14 different 4-plex ESC permits and 1 site devlopment permit. ESC14-00059 to 00074 and ESC14-00351.
No corrections at this time.
RP Ken Scaggs was onsite monitoring the project.
|
Site Preparation | 6/26/2014 | 6/26/2014 | 6/26/2014 | P | PASS |
Mike Jordan
|
|
|
|