DOC - Permit Finaled | 1/6/2015 | 1/6/2015 | 1/6/2015 | P | PASS |
Andy J. Long
|
|
|
Cordillera 4-plex complete and landscaped. Parking lot installed. WIP on 4 remaining units and ESC14-00069 & ESC14-01058 (pool) are still active.
|
General Inspection | 1/2/2015 | 1/2/2015 | 1/2/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/17/2014 | 11/17/2014 | 11/17/2014 | | PASS |
Evan Jenkins
|
|
|
Site covered in snow and frozen. No ESC issues at this time
|
General Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 | | FAIL |
Evan Jenkins
|
|
|
Contractor had Curtis Clean Sweep out onsite to sweep yesterdays trackout issues, but did not address construction entrance. Significant Trackout occuring through out project and onto Florence Dr. Contractor called Curtis Clean Sweep while I was talking with him to get area swept again. He will fluff up and add additional rock to construction entrance and block off areas to reduce trackout from vehicle traffic.
|
General Inspection | 8/15/2014 | 8/15/2014 | 8/15/2014 | | PART |
Evan Jenkins
|
|
|
area needs swept
|
Site Preparation | 6/30/2014 | 6/30/2014 | 6/30/2014 | P | PASS |
Mike Jordan
|
|
|
|