DOC - Permit Finaled | 1/6/2015 | 1/6/2015 | 1/6/2015 | P | PASS |
Andy J. Long
|
|
|
Cordillera 4-plex complete and landscaped. Parking lot installed. WIP on 4 remaining units and ESC14-00069 & ESC14-01058 (pool) are still active.
|
General Inspection | 12/30/2014 | 12/30/2014 | 12/30/2014 | | PASS |
Evan Jenkins
|
|
|
WIP; No esc issues
|
General Inspection | 11/14/2014 | 11/14/2014 | 11/14/2014 | | CANC |
Evan Jenkins
|
|
|
due to dangerious snow conditions/road ways, unable to make it to the inspection
|
General Inspection | 9/29/2014 | 9/29/2014 | 9/29/2014 | | FAIL |
Evan Jenkins
|
|
|
Significant trackout occuring after weekend rains through out project, then out onto Florence Dr. Contacted Ken Scaggs. He stated via phone he will get Curtis Clean Sweep to take care of the issues, and address the construction entrance behind Anderson Construction's Job Trailer. Will follow up tomorrow 9-29-14 to see if violations have been fixed/addressed
|
General Inspection | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PASS |
Andy J. Long
|
|
|
Cordillera townhome in progress. Parking lot has now been paved, reducing dust issues. No sediment or discharges leaving site. Stormwater drainage has been installed. Need to check for adequate protection next inspection. No corrections at this time.
|
Site Preparation | 8/11/2014 | 8/12/2014 | 8/11/2014 | A | CANC |
Andy J. Long
|
|
|
data entry error
|
General Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for 8/12
|
Site Preparation | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | PASS |
Mike Jordan
|
|
|
|