Permit Information
Permit NumberESC14-00075
StatusFinaled
Name WENDY LARIMORE
Site Address 1181 E WARM SPRINGS AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
waiver request DENIED. Resubmission of a full ESC Plan and Site Maps recieved 2-13-14
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled9/3/20149/3/20149/3/2014APASS
DetailsAndy J. Long
Geothermal project at the Natatorium is complete. Materials have been removed, access road has been swept, and no undisturbed earth remains. No further ESC inspections necessary, permit conditions met.
General Inspection8/26/20148/26/20148/26/2014 PASS
DetailsAndy J. Long
No changes at site. No corrections. Permit is still posted.
General Inspection8/8/20148/8/20148/8/2014 PASS
DetailsEvan Jenkins
General Inspection7/24/20147/24/20147/24/2014 PASS
DetailsAndy J. Long
General Inspection7/9/20147/9/20147/9/2014 PASS
DetailsAndy J. Long
No activity. Will be ready for final next inspection.
General Inspection6/24/20146/24/20146/24/2014 PASS
DetailsAndy J. Long
General Inspection6/6/20146/6/20146/6/2014 PART
DetailsAndy J. Long
East side parking lot needs sweeping. WIP inside the Nat. Exterior work is complete.
General Inspection5/22/20145/22/20145/22/2014 PASS
DetailsAndy J. Long
Interior work for geothermal pool heating is ongoing. Exterior work and utilitiy trench complete and repaved. DI bags protected. No corrections at this time.
General Inspection5/7/20145/7/20145/7/2014 PASS
DetailsAndy J. Long
Exterior work and trenching is complete. Mostly interior work remains to use and heat exchange system to heat the pool. DI protection in place, permit posted.
General Inspection4/18/20144/18/20144/18/2014 PASS
DetailsAndy J. Long
No activity at time of inspection. Geothermal pipe has been installed, trench is yet to be paved but have been swept. Storm drains have filter bag protection, permit posted at Nat front office.
General Inspection4/2/20144/2/20144/2/2014 PART
DetailsAndy J. Long
The strip of road where utility pipe was laid has not yet been repaved and dirt is mixing with stormwater. Storm drains have filter protection but the road and surrounding gutters should be swept and dirt removed. Will inspect later in week, no activity at time of inspection.
General Inspection3/14/20143/14/20143/14/2014 PASS
DetailsAndy J. Long
Appears that concrete for water line has been cut. BMPs still in place on DI's. Unclear if geothermal line has been installed. No trackout or stockpiles on street observed. Some work on going at the back of pool. No corrections required.
Site Preparation2/14/20142/14/20142/14/2014PPASS
DetailsEvan Jenkins
levi Phone #: ###-####
Walked the Site with RP Levi. Everything protected that needs BMP's. Construction sign posted on building infront of pool.
Approved