DOC - Permit Finaled | 5/28/2014 | 5/28/2014 | 5/28/2014 | P | PASS |
Andy J. Long
|
|
|
House complete, landscaped, and occupied. BLD already finaled. ESC conditions satisfied.
|
Random Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 | P | FAIL |
Andy J. Long
|
|
|
Correction notice posted.
1. Sweep/clean up concrete washout dust/debris from adjacent gutter on Deer Ridge. 2. Provide trash enclosure/container. 3. Make concrete contractors use designated washout
RP Adam notified by phone. Stated will make corrections ASAP. Framing team will build trash enclosure.
|
Site Preparation | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PASS |
Andy J. Long
|
|
|
adam Phone #: ###-####
Permit posted. No downstream drop inlet. Construction access will be provided as needed. No surfaces water, flat. May require dust suppression later this year.
|