General Inspection | 4/18/2014 | 4/18/2014 | 4/18/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 4/18/2014 | 4/18/2014 | 4/18/2014 | P | PASS |
Andy J. Long
|
|
|
Staging area has been disassembled and cleaned. No further inspections required. ESC conditios satisfied, returned to pre-existing conditions.
|
General Inspection | 4/2/2014 | 4/2/2014 | 4/2/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 | | PASS |
Andy J. Long
|
|
|
Idaho Power staging area looks good. No trackout or sediment leaving site. Permit is posted across the street. Actual work is occuring in the ACHD R.O.W. in Foothills East.
|
Site Preparation | 2/12/2014 | 2/12/2014 | 2/12/2014 | P | PASS |
Evan Jenkins
|
|
|
Reschedual due to rain/Runoff issues on other sites Met w/ Eldon (RP) onsite to discuss staging area. Idaho Power will Gravel entire Staging area to limit potential trackout. He will post construction sign on a Connex Storage Trailer when it gets onsite
|
Site Preparation | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | CANC |
Evan Jenkins
|
|
|
eldon will be at job site after 10:30 am Phone #: ###-#### PLEASE CALL BEFORE GOING OUT
HAD TO RESCHEDUAL DUE TO RAIN/RUNOFF ISSUES ON OTHER SITES FOR THIS AFTERNOON: EJ
|