General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 6/25/2015 | 6/25/2015 | 6/25/2015 | P | PASS |
Evan Jenkins
|
|
|
Projects Complete, re-vegetated and temp BMP's removed. ESC conditions satisfied
|
General Inspection | 5/25/2015 | 5/25/2015 | 5/26/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete. Construction fencing BMP still installed around area that was disturbed and then revegetated. Will check with Parks to see if contractor needs to take down fence.
|
General Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 | | PASS |
Andy J. Long
|
|
|
Pavillion on the duck pond is constructed. The staging area and new grass plantings are stabilizing/establishing. No activity at time of inspection. No violations or discharges. Will keep open to continue to monitor.
|
General Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | | PASS |
Andy J. Long
|
|
|
Cancer Pavillion project is in progress. No construction occuring at time of inspection. Cement pad has been poured next to the pond. Wattles and construction fencing protect the area and the edge of pond rock structures are undisturbed. Water level is currently below building area and sandbags are in place.
Permit is posted. No violations observed.
|
General Inspection | 2/19/2015 | 2/19/2015 | 2/23/2015 | | PASS |
Andy J. Long
|
|
|
No activitiy. No violations.
|
General Inspection | 1/19/2015 | 1/19/2015 | 1/20/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 | | PASS |
Andy J. Long
|
|
|
Project currently inactive but not complete. Disturbed bank where dock/viewing deck will be installed is blocked off from rest of pond with sand bag barrier. No corrections
|
General Inspection | 11/17/2014 | 11/17/2014 | 11/17/2014 | | PASS |
Andy J. Long
|
|
|
Pavillion and work associated with new parking lot and sidewalks is complete. See ESC14-00485. The phase of project next to pond is currently shut down for winter. No ESC issues or discharges from site.
|
General Inspection | 10/17/2014 | 10/17/2014 | 10/17/2014 | | PASS |
Andy J. Long
|
|
|
Trevor's Trek pavillion in progress. No activity next to pond today, sandbag sediment barrier is still installed and effective. No trackout or other issues. Approved.
|
General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 | | PASS |
Andy J. Long
|
|
|
Cancer memorial is in progress. Area of disturbance has heavy duty fiber wattle between it and the goose pond. The other edges of site have inward sloping sheet flow with no flow towards river. The pier structure on bank of pond has not yet started.
Permit is posted, site is surrounded by orange fencing, and no trackout observed to Myrtle.
|