DOC - Permit Finaled | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied. All other permits finaled. ESC permit conditions satisfied.
|
Tracking Control | 4/4/2014 | 4/4/2014 | 4/4/2014 | P | FAIL |
Andy J. Long
|
|
|
Tracking from foundation pouring trucks needs to be cleaned up. Big mud clods should be shoveled Brighton RP issued verbal warning for projects in Mill District Square.
|
Site Preparation | 3/5/2014 | 3/6/2014 | 3/6/2014 | A | PASS |
Andy J. Long
|
|
|
Please call with any questions. Thanks Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
Site is ready for excavation. MIll District Square in good condition. Permit posted, BMPs in place. Approved. Brighton Homes now has two RPs Braxton and Josh
|