DOC - Permit Finaled | 6/3/2014 | 6/3/2014 | 6/3/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/3/2014 | 6/3/2014 | 6/3/2014 | | PASS |
Andy J. Long
|
|
|
Deck foundations and platform complete. All disturbed earth stabilized. Portable concrete washout utilized and will be recycled. Completing painting and installing railing. ESC permit conditions satisfied.
|
General Inspection | 4/30/2014 | 4/30/2014 | 4/30/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted. No trackout or other violations observed. RP onsite keeping the situation compliant.
|
Site Preparation | 3/26/2014 | 3/26/2014 | 3/26/2014 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 3/18/2014 | 3/18/2014 | 3/18/2014 | A | PASS |
Andy J. Long
|
|
|
meet RP Kevin at 10:30 for site prep.
BMPs installed, washout container onsite, permit posted. Discussed project with RP. Work is confined to backyard so am allowing no DI bags unless project changes.
|