Site Final | 10/16/2014 | 10/17/2014 | 10/17/2014 | A | PASS |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 10/17/2014 | 10/17/2014 | 10/17/2014 | P | PASS |
Evan Jenkins
|
|
|
project complete BMP's have been removed no esc issues
|
General Inspection | 9/2/2014 | 9/2/2014 | 9/2/2014 | | PASS |
Andy J. Long
|
|
|
Construction of splash park is complete. Some temp BMPs are still installed at site and work is in progress for B.U.G.S. Will keep open to monitor. No corrections at this time. No activity at time of inspection.
|
General Inspection | 7/15/2014 | 7/15/2014 | 7/15/2014 | | PART |
Evan Jenkins
|
|
|
called Darrin to repair/replace silt fence along 5 Mile Road. Left VM. Disclosed for him to contact me back about proceeding addressing this issues. will follow up tomorrow at some point
|
General Inspection | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | PASS |
Andy J. Long
|
|
|
WIP. Stabilized construction access in good condition. Swale protected by wattle. Silt fence installed along irrigation ditch to the west. No corrections at this time.
|
General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 | | PASS |
Evan Jenkins
|
|
|
BMP's installed throughout site. Silf fence has been installed along the back of the site along the canal that runs by, where the new barn will be placed. No ESC issues at time of inspection
|
General Inspection | 3/26/2014 | 3/26/2014 | 3/26/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues w/ the City's property. ACHD is performing maintenance work on the ROW in front of the park on Five Mile: Pretty Messy
|