Permit Information
Permit NumberESC14-00144
StatusFinaled
Name JIM CONGER
Site Address 6800 E WARM SPRINGS AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
East Valley Subdivision Phase 1***as per Diane phase 1 is now phase 1 & 2***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection5/14/20155/14/20155/14/2015 PASS
DetailsAndy J. Long
Development of East Valley phase 1 is complete. SFHs are in progress by Tahoe Homes with individual ESC permits issued.

East Valley SWPPP and CGP related project is now covered by City of Boise permit ESC15-00556. Site will now be inspected and monitored under the inspection activity of that permit.

No violations, fugitive dust, or trackout. Grading for new phase is cleared to start, BMPs installed. No work commenced yet.
DOC - Permit Finaled5/14/20155/14/20155/14/2015PPASS
DetailsAndy J. Long
General Inspection4/29/20154/29/20154/29/2015 PASS
DetailsAndy J. Long
East Valley SFHs in progress. Subdivision BMPs installed and no maintenance needed at this time. No grading or other action -- no fugitive dust observed. First 6 homes on Sky Bar are now complete and landscaped.
General Inspection4/14/20154/14/20154/14/2015 PASS
DetailsAndy J. Long
Subdivision BMPs installed. WIP on SFHs. No significant loose dirt in streets and gutters, no discharges, no fugitive issues at time of inspection.
Random Inspection3/30/20153/30/20153/30/2015PPASS
DetailsAndy J. Long
Checked back on East Valley. No hauling is occuring, no dust, no trackout. Water truck was used for dust Friday afternoon as requested.
BMP Violation3/27/20153/27/20153/27/2015PPASS
DetailsAndy J. Long
Hauling stockpile in previously graded area to Parckcenter roundabout.

No water truck on site for dust control. Conditions areagetting dustier with use and heat.
Requested water truck be onsite to wet down haul road ASAP. RP stated water truck was enroute. C & A paving was alson contacted.
General Inspection3/24/20153/24/20153/24/2015 PASS
DetailsAndy J. Long
East Valley sub in good condition. Tahoe Homes building SFHs under seperate permits. Roads, gutters, and sidewalks are free of loose sediment. No trackout from open areas, no hillside erosion observed, lined concrete washout provided.

No corrections at this time.
General Inspection3/9/20153/9/20153/10/2015 PASS
DetailsAndy J. Long
East Valley subdivision has individual SFHs in progress. First round on Sky Bar is near completion.

All stormdrains have inlet protection, fiber wattles are installed at areas where sheet flow caused sediment runoff to streets. Sediment trench and berm has also be excavated to trap and retain sheet flow onsite. Lined concrete washout is being used and trash is contained in bins.

Silt fence is incorrectly installed but is being used as a construction fence to prevent vehicle traffice across landscaped area.

No corrections at this time. But will need Ground FX / Conger remove the discarded wattles.
General Inspection2/20/20152/20/20152/20/2015 PASS
DetailsAndy J. Long
East Valley sub in good condition. Only some minor trackout from a SFH project. Inlets protected, concrete washout is lined. No corrections needed at this time.
Random Inspection2/5/20152/5/20152/5/2015APASS
DetailsAndy J. Long
East Valley BMPs have been repaired and a new lined concrete washout provided. Workers and material delivery vehicles staying off muddy open areas.
Tracking Control1/26/20151/26/20151/26/2015PPART
DetailsAndy J. Long
Significant trackout from uncontrolled offroad driving open areas by workers, material unloaders, and quite possibly joyriders.

Tahoe Homes RP blocked off area where workers were driving with caution tape and also has instructed workers and material loaders to stay off mud.

Street sweeper is scheduled for Saturday, which should be good as the

No discharges or trackout out of East Valley subdivision. DI filter bags are installed and have remaining capacity.

Need to re-stake the fiber wattles that were lifted up.
Random Inspection1/16/20151/16/20151/16/2015PPASS
DetailsAndy J. Long
Inspected East Valley sub to see if BMPs withheld the siginificant amount of rain received earlier today.

Compost wattles and trench with berms built in low discharge area have worked effectively. No blows out muddy running into the storm drain (which is also protected).

Tahoe Homes contractors doing well to stay off the open areas to prevent trackout.

Lined washout installed is near full and needs replacement.
General Inspection1/7/20151/7/20151/7/2015 PART
DetailsAndy J. Long
East Valley subdivision has individual SFHs in progress by Tahoe Homes. Concrete washout is onsite and is lined. Will need to be replaced for next round of homes as is about 75% full.

No trackout to streets or onto Warm Springs. DI bags installed, clean up from storm in December has been completed. No corrections at this time other than housekeeping and the wash out.
Random Inspection12/23/201412/23/201412/23/2014PPART
DetailsAndy J. Long
East Valley sub is in good condition. No new erosion rills on hillsides and banks observed. Lined concrete washout, drop inlet protection, and fiber wattles at discharge/low points have been installed.

1 correction:

Clean out inlet protection mat and dirt on gutter and street at the southwest corner where fiber wattles have been overwhelmed. Need to consider installing additional BMPs here,such as a silt fence.
General Inspection12/17/201412/17/201412/17/2014 PASS
DetailsAndy J. Long
No subdivision development related activity occuring at East Valley. Sewer pump station is installed, landscaping along Warm Springs is complete. Perimeter fiber wattles installed to contain sediment runoff from open central areas.

Individual SFH projects with permits are also in compliance.
Random Inspection12/2/201412/2/201412/2/2014APASS
DetailsAndy J. Long
East Valley sub drainage design and sediment control BMPs were effective in preventing sediment runoff from open areas and SFH sites during the last 2 two days of precipitation.

DIs have coir mat protection. Some minor trackout on roads, but contractors are staying off dirt and parking on street. Lined concrete washout in good condition. No discharges or other ESC issues observed at time of inspection. Still working on the sewer lift station on the south west corner.
Random Inspection11/24/201411/24/201411/24/2014PPASS
DetailsAndy J. Long
No sediment runoff onto hard surfaces and streets in East Valley after the snow has melted. Perimter fiber compost rolls are installed and have trapped sediment. In addition, at low areas at settling trench and earthen berm has been installed. No trackout to Warm Springs, no dewatering occuring.

Approved, no corrections at this time. Phase 2 has not started yet.
General Inspection11/19/201411/19/201411/19/2014 PASS
DetailsAndy J. Long
Limited activity. SFH homes in progress by Tahoe Homes. No runoff issues yet, still froxen.
General Inspection11/4/201411/4/201411/4/2014 PASS
DetailsAndy J. Long
East Valley Sub BMPs contained most sediment behind fiber wattles. No serious trackout or sediment runoff to hard surfaces.

No corrections at this time.
General Inspection10/20/201410/20/201410/20/2014 PASS
DetailsAndy J. Long
East Valley subdivision now has individual homes being built. No major trackout, discharges, dust or other issues observed. Fiber wattles have been installed in areas where sediment ran off lots in the last storm event and all stormdrain DI's have filter protection. No corrections at this time.
General Inspection10/3/201410/3/201410/3/2014 PASS
DetailsEvan Jenkins
site is in decent shape. some minor trackout occuring from landscapers. I talked to them and they will sweep up the issues
General Inspection9/17/20149/18/20149/18/2014PPART
DetailsAndy J. Long
Site observations:

No trackout to Warm Springs, All DI to seepage system have silt bag protection. Perimeter fiber compost/bark wattles line many areas.

Issues: landscapers have removed some wattles to park on dirt and our causing trackout within the subdivision. Wattles have also been driven over in some areas that could cause blowouts.

Recommended to RP Conger that they may want to install check dams and that he should monitor the weather and make corrections prior to next storm. 40 % chance of rain forecasted for Sunday 9/21....
General Inspection9/17/20149/17/20149/17/2014 CANC
DetailsAndy J. Long
rescheduled for 9/18 due to ESC conference
General Inspection9/2/20149/2/20149/2/2014 PASS
DetailsAndy J. Long
Only minor activity at East Valley at time of inspection. No dust, no trackout, or other violations observed.

Additional Filtrex wattles are installed and streets are mostly clean from previous washout/blowout. DI bags were maintained and have remaining capacity. Approved.
Partial Stop Work Order8/14/20148/15/20148/14/2014APART
DetailsEvan Jenkins
Reinspect to see if violations been addressed and corrected. Sweep all roads, clean out all impacted Drop Inlets, Clean out adjacent business from flooding, Install Perimeter BMP's
Clean up has begun. Will follow up this afternoon and reinspect tomorrow 8-15-14
Partial Stop Work Order8/14/20148/14/20148/14/2014APART
DetailsEvan Jenkins
Internal work SWO. Met Jim Conger onsite along with Ground FX to correct BMP Violations (No Perimeter Controls Installed, Large Amount of sediment left interior site, filled Drop Inlets,
Excessive Sediment Running over sidewalks and roads, along with flooding out a neighbor business with mud and water. Conger is bringing in extra crews and equipment to begin cleanup and repairs to adjacent business, to address violations imediately.
CLEAN UP HAS BEGUN
Tracking Control8/13/20148/13/20148/13/2014APASS
DetailsAndy J. Long
Corrections issued on 8/12 have been made.

1. Road was swept last night and small sweeper unit is on site today. Driver is alternating use of the water truck and sweeper.

2. Construction entrance was restored with more rock and turning over the existing rocks.

Dust observation - no major dust at time of inspection (12 PM), suppression and drivers going slow is helping today in combination with the cooler weather and intermittent rain.
General Inspection8/12/20148/12/20148/12/2014PPART
DetailsAndy J. Long
Site has one water truck that is still filling up at Dallas Harris #12 so there is some lapse time when truck is at site. Haul road and area where dirt is being loaded has be wettened, but need to increase spray on Warm Springs east of entrance. Talked to water truck driver Ross who said he will extend his spray.

Corrections:
1. RP has ordered street sweeper for this evening (end of day)
2. Knife River will turn over/refresh construction entrance/tracking pad.
3. Trans Systems drivers need to slow down.
Random Inspection7/29/20147/29/20147/29/2014PPASS
DetailsAndy J. Long
Dust control was inadequate on Monday with excessive fugitive dust and the ground dried out from inactivity on Sunday.

Now there is full time water truck and road sweeper on-site and the rock entrance has been restored.

Dust control efforts are satisfactory and are working well today. They are projected to finish this weekend.

General Inspection7/24/20147/24/20147/24/2014PPART
DetailsAndy J. Long
Dust check up.

Trucks are driving much slower and the mag chloride is also helping keep dust down. The water truck comes 1x per hour, may need to increase as day continues.

Unrelated to dust, need to install storm drain filter bags at entrance on Sky Bar. RP has been notified.

General Inspection7/23/20147/23/20147/23/2014PPASS
DetailsAndy J. Long
Fugitive dust conditions are much improved today. The suppressant is working fairly well but more important factors seem to speed of trucks on haul road and water application.

Will need to have a water truck full time at site as the mag chloride breaks down.
BMP Violation7/23/20147/23/20147/23/2014APASS
DetailsAndy J. Long
SWO corrections have been addressed.

Corrections made:
1. Magnesium chloride dust suppressant has been applied on the entire loop of the haul road to and from Warm Springs to stockpile area.
2. Water trucks will be used 1 x per hour and will increase as necessary.
3. At time of inspection no dust created by truck traffic.
4. Mr. Conger stated Warm Springs will be swept at end of the day in front of East Valley and Harris Ranch.

Approved to continue work. Will check in later today when conditions are hotter and drier to see if mag chloride is effective.
Stop Work Order7/22/20147/22/20147/23/2014PDONE
DetailsAndy J. Long
Excessive dust. Inadequate dust control and suppression.

Trucks speeding.
No water truck on site.
No polymer or suppression on haul road
No construction entrance to Warm Springs
Uncovered loads

No work until all violations/observation are rectified.
Conference7/22/20147/22/20147/22/2014PFAIL
DetailsAndy J. Long
Returned to site to find no corrections or effort at dust control.

Issuing Stop Work Order with corrections.
Complaint Inspection7/22/20147/22/20147/22/2014AFAIL
DetailsAndy J. Long
Dust complaint. Off-hauling stockpile to fill new Harris Ranch, so causing lots of dust. Need to investigate further.

Inspection observations:
1. Off-hauling is the source of dust. Allegedly started over the weekend.
2. Most of the dust is coming from heavy truck traffic on the stockpile access road.
3. No water truck on site at time of inspection. Trying to split one water truck between the two sites.
4. Dust from the loading of trucks is not the main source - its truck traffic.
5. Truck operateor said they are not covering their loads but rather only filling them half full. Did see much dust coming from trailors traveling on Warm Springs to Harris Ranch..

Corrections issued:
1. RP Jim Conger is having American Dust Control apply magnesium chloride on road this evening.
2. Need a water truck onsite immediately.
3. Drivers need to slow down.
Failure to comply may stop work until the suppressant is applied this evening.
Random Inspection7/15/20147/15/20147/15/2014PPASS
DetailsAndy J. Long
Underground utilities have been installed, roads paved, and curbing installed. No dust issues, trackout, or illicit discharges observed at time of inspection.
General Inspection7/3/20147/3/20147/3/2014 PASS
DetailsAndy J. Long
East Valley sub has frontage sidewalk and earth berm installed. Curb work for streets is in place. Workers on site doing soil compaction tests and surveying for road. No dust observed and no tractor traffic at that that time. No track out to Warm Springs. Site is currently in compliance.
General Inspection6/17/20146/17/20146/17/2014 PASS
DetailsAndy J. Long
Underground utilities in first East Valley Sub have been mostly installed. Starting work on the roads , gutters and sidewalk. Permiter wattles line Warm Springs. Construction entrance rock is piled on site, but the entrance has not been installed. No trackout issues apparent at site. Will continue to monitor. No dust seen crossing Highland Valley Road or Warm Springs. No corrections required at this time.
Random Inspection6/2/20146/2/20146/2/2014PPASS
DetailsAndy J. Long
East Valley sub inspected en route to other inspections:

No significant fugitive dust or track out. No discharges or material storage issues. Stockpile from hillside excavation is in active use, but the undisturbed end has vegetated.

No corrections at this time. Looks like road will be installed soon...
Conference5/16/20145/16/20145/16/2014PDONE
DetailsAndy J. Long
Discussed East Valley sub development with RP Jim Conger after he returned my call from earlier.

Water trucks were on site, but not in use at time of inspection. Some dust, but not visibly crossing project area. Told Brown Construction employee to slow down while driving big tractor, to which he agreed. Discussed dust control practices that will be implemented during more activity

Large stockpile at north end of site is currently in use for active utility work and grading. Some portions have naturally vegetated. The dirt is potentially going to be used at new Harris Ranch phase currently under review. If stockpile is inactive for more than 2 weeks at a time, tacifier/mulch will be used to stabilize. The pile was tacified once earlier in the year according to Mr. Conger.

Offsite utility project (ESC14 -00238)is currently on hold but should resume next week in coordination with new Brighton Homes project.

No recent citizen complaints brought to my attention.

Corrections:

1. Install main construction entrance per SWPPP and restrict access in other areas that have been used by different contractors.

2. Ensure dust controls are in place in future phases.
General Inspection5/15/20145/15/20145/15/2014 PART
DetailsAndy J. Long
Sewer trunk extension to East Valley is installed. Need to check for vegetation and stabilization in areas outside of roadway. East Valley is continuing to be graded & grubbed. The construction entrances are not installed to specifications in the SWPPP, but no trackout observed and there has been no hauling or off hauling. No significant fugitive dust observed leaving the area.
General Inspection4/25/20144/25/20144/25/2014 PEND
DetailsAndy J. Long
No new violations. Still need to confirm status of stockpile from intial hill cutting. It has been inactive for some time and not stabilized.
General Inspection4/3/20144/3/20144/3/2014 PASS
DetailsAndy J. Long
No violations observed. Walked south side of Warm Springs from Crow Inn to the first drainage area. There is no culvert or conveyance pipe visible to the canal or river further to the south.
Site Preparation3/18/20143/19/20143/19/2014APASS
DetailsAndy J. Long
jim Phone #: ###-####

SWPPP and ESC permit posted onsite. Perimeter wattles have been set in place, but rock construction entrance is not yet installed. No surface waters or creeks running through site, which is also relatively flat.

Will need to watch dust once the vegetation is disturbed. When stockpile hauling begins, a heavy duty construction entrance will be necessary.