Site Final | 9/24/2014 | 9/29/2014 | 9/29/2014 | A | PASS |
Andy J. Long
|
|
|
Site Final requested by Brad with Andersen Construction ###-####
Construction on ambulance canopy is complete and all areas stabilized with hardscape or landscaped. Temporary BMPs removed. ESC conditions satisfied.
|
DOC - Permit Finaled | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 9/24/2014 | 9/24/2014 | 9/24/2014 | A | CANC |
Andy J. Long
|
|
|
data entry
|
General Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 | | PASS |
Andy J. Long
|
|
|
Ambulance canopy is in progress. Work and disturbance is within designated limits of construction. No ESC violations or non-stormwater discharges.
|
General Inspection | 7/3/2014 | 7/3/2014 | 7/3/2014 | | PASS |
Andy J. Long
|
|
|
Work in progress. Construction area has security fence around site with stabilized entrance/loading area. Permit is posted on fence. No trackout or discharges observed. No corrections.
|
General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 | | PART |
Evan Jenkins
|
|
|
Contractor to place contact information on construction signage
|