Permit Information
Permit NumberESC14-00157
StatusFinaled
Name CLIVE CULPAN
Site Address 957 S CAPITOLA WAY
Project NameCobb
Customer Number 
ePlanReviewNo
Description
As per ESC conditions, New single family home construction. Half of lot is is a steep bank that will require a retaining wall, wattles to be installed on slopes surrounding wall. Natural drainage area, so will need to monitor trackout and contain all liquid wastes and dispose properly. ESC plan submitted and approved. Site prep inspection required prior to excavation.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection4/8/20154/8/20154/8/2015 PASS
DetailsAndy J. Long
Home construction complete. Yard has been landscaped/stabilized and gutters & sidewalks cleaned. BLD permit final pending interior changes. No further ESC inspections required, permit finaled.
DOC - Permit Finaled4/8/20154/8/20154/8/2015PPASS
DetailsAndy J. Long
General Inspection3/24/20153/24/20153/24/2015 PASS
DetailsAndy J. Long
Near completion. Yard was just landscaped/stabilized. Need to do final sidewalk and driveway sweep up to final permit. BLD still open. No issues or dirty runoff.
General Inspection3/9/20153/9/20153/10/2015 PASS
DetailsAndy J. Long
General Inspection2/20/20152/20/20152/20/2015 PASS
DetailsAndy J. Long
Site perimeter is undisturbed. No uncontained trash, trackout, or discharges. The sidewalk and gutter need to be swept during housekeeping, but is a minor amount. Project near completion.
General Inspection2/4/20152/5/20152/5/2015APASS
DetailsAndy J. Long
General Inspection2/4/20152/4/20152/4/2015 CANC
DetailsAndy J. Long
rescheduled for 2/5
General Inspection1/20/20151/20/20151/20/2015 PASS
DetailsAndy J. Long
WIP. Frame is up. Contractors parking on street, no trackout; permit posted.
General Inspection1/5/20151/5/20151/5/2015 PASS
DetailsAndy J. Long
General Inspection12/19/201412/19/201412/19/2014 PASS
DetailsAndy J. Long
WIP. Permit posted. Frame is up. No violations.
General Inspection12/4/201412/4/201412/4/2014 PASS
DetailsAndy J. Long
SFH in progress. Retaining wall installed. No trackout or discharges offsite.
General Inspection11/19/201411/19/201411/19/2014 PASS
DetailsAndy J. Long
Working on frame. No trackout or discharges.
General Inspection11/4/201411/4/201411/4/2014 PASS
DetailsAndy J. Long
WIP. No trackout or discharges. Sub-contractors are parking on street to prevent trackout. No loose sediment accumulations collected in gtter. Hillside next to retaiing wall has been sprayed with hydroseed & tacifier.
General Inspection10/20/201410/20/201410/20/2014 PASS
DetailsEvan Jenkins
General Inspection9/29/20149/29/20149/29/2014 PASS
DetailsAndy J. Long
WIP. Framing in progress, no trackout or issues after weekend's rain. Permit posted. Approved.
DOC - Permit Finaled9/29/20149/29/20149/29/2014PPASS
DetailsAndy J. Long
(This activity was added in error so we have changed the case status back to Issued.)
Random Inspection8/29/20148/29/20148/29/2014APART
DetailsAndy J. Long
Permit posted. No trackout to culdesac.

The is some sediment and dust on side, need to implement more daily housekeeping to contain sediment.
General Inspection8/27/20148/27/20148/27/2014 PASS
DetailsEvan Jenkins