Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC14-00158
StatusFinaled
Name STEVE BRUNEEL
Site Address 525 E ORION CT
Project Name 
Customer Number 
ePlanReviewNo
Description
permit to stockpile soils for construction of new house at 513 Orion (Bld13-03195, ESC13-01167).
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection2/6/20152/6/20152/6/2015 PASS
DetailsAndy J. Long
Construction materials have been removed from staging area and no sediment is leaving site. A new home is to be built on the parcel this spring. No further inspections for this permit. See ESC13-01167
DOC - Permit Finaled2/6/20152/6/20152/6/2015PPASS
DetailsAndy J. Long
General Inspection1/22/20151/22/20151/22/2015 PASS
DetailsAndy J. Long
General Inspection1/7/20151/7/20151/7/2015 PASS
DetailsEvan Jenkins
Contractors still utilizing area for parking/storage. no esc issues at this time
General Inspection12/23/201412/23/201412/23/2014 PASS
DetailsAndy J. Long
Staging and parking area still in use. NO issues.
General Inspection12/8/201412/8/201412/8/2014 PART
DetailsAndy J. Long
No hillside erosion issues or improper material storage observed.

Significant trackout from staging area to Orion Ct. due to recent wet weather.

Correction:
- sweep up as road starts to dry, still pretty wet

Verbal request issued to RP/GC Matt Brown
General Inspection11/21/201411/21/201411/21/2014 PASS
DetailsAndy J. Long
Trash and materials are contained. No trackout from staging area or spills observed. No corrections needed.
General Inspection11/6/201411/6/201411/6/2014 PASS
DetailsAndy J. Long
No trackout from staging area which is still in use. No corrections at this time.
General Inspection10/22/201410/22/201410/22/2014 PASS
DetailsEvan Jenkins
General Inspection10/7/201410/7/201410/7/2014 PASS
DetailsAndy J. Long
Lot being used for staging and contractor parking area. No trackout or erosion issues. Wood and trash being kept seperate for recycling purposes.

Approved.
General Inspection9/5/20149/5/20149/5/2014 PASS
DetailsEvan Jenkins
General Inspection8/5/20148/5/20148/5/2014 PASS
DetailsEvan Jenkins
General Inspection7/4/20147/4/20147/7/2014 CANC
DetailsAndy J. Long
holiday
General Inspection6/3/20146/3/20146/3/2014 PART
DetailsAndy J. Long
No issues with stockpile and parking site. Permit posted. Another contractor has built a road on backside of houses to north. Going to investigate. The disturbed area will need restabilization.
General Inspection5/2/20145/2/20145/2/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
General Inspection3/26/20143/26/20143/26/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
permits posted