Site Final | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Andy J. Long
|
|
|
Construction now complete, yard is stabilized and landscaped. Streets and sidewalks are clean. All permits finaled.
|
Aging Inspection | 10/16/2015 | 10/16/2015 | 10/16/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no issues observed at time of inspection
|
Site Preparation | 5/6/2015 | 5/7/2015 | 5/7/2015 | A | PASS |
Evan Jenkins
|
|
|
Robert Phone #: ###-####
Permit posted in front of lot on metat post: Existing concrete washout from previous townhome construction. Lot is extremely flat, and at a lower elevation than other lots. Approved to begin construction
|