General Inspection | 10/22/2014 | 10/22/2014 | 10/22/2014 | | PASS |
Andy J. Long
|
|
|
ESC site final inspection. Yard is landscaped and stabilized. DI filter insert downhill on Hillway has been removed. Walked site with RP/GC Aaron. Rear steep hillside has been stabilized with erosion control mat. Mat is stapled in, fescue seed has been planted underneath, top of mat is trenched in with wattle. Good installation, minimal "tenting" of mat.
ESC permit conditions satisfied. BLD open for PW drainage inspection and site final.
|
DOC - Permit Finaled | 10/22/2014 | 10/22/2014 | 10/22/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/7/2014 | 10/7/2014 | 10/7/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/5/2014 | 9/5/2014 | 9/5/2014 | | PASS |
Andy J. Long
|
|
|
Near completion. No trackout or sediment leaving site. Permit posted.
|
General Inspection | 8/5/2014 | 8/5/2014 | 8/5/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/4/2014 | 7/4/2014 | 7/7/2014 | | CANC |
Andy J. Long
|
|
|
holiday
|
General Inspection | 6/3/2014 | 6/3/2014 | 6/3/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted. No violations observed.
|
General Inspection | 5/2/2014 | 5/2/2014 | 5/2/2014 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 3/18/2014 | 3/19/2014 | 3/19/2014 | A | PASS |
Evan Jenkins
|
|
|
Please call ahead for access/questions - Aaron Phone #: ###-####
|