DOC - Permit Finaled | 3/30/2015 | 3/30/2015 | 3/30/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/30/2015 | 3/30/2015 | 3/30/2015 | | PASS |
Andy J. Long
|
|
|
Picnic shelter complete. Landscaping and stabilization finaled. ESC permit conditions satisfied.
|
General Inspection | 2/10/2015 | 2/10/2015 | 2/10/2015 | | PASS |
Andy J. Long
|
|
|
Outdoors seating pavillion in parking lot is in progress. No trackout or offsite muddy discharges.
|
General Inspection | 12/26/2014 | 12/26/2014 | 12/26/2014 | | PASS |
Andy J. Long
|
|
|
No activity. No loose sediment in parking lot area. DI is protected with filter bag.
|
Random Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 | P | PASS |
Andy J. Long
|
|
|
Work has started on pavillion within church parking lot. Receiving DI has filter bag protection. No sediment leaving site, no stormwater pollution sources.
|
General Inspection | 10/21/2014 | 10/21/2014 | 10/21/2014 | | NR |
Andy J. Long
|
|
|
No construction acitivity at site yet for picnic pavillion. Flat; low risk site with limited earth disturbance. Will need to protect the receiving storm drain in parking lot when they start.
|