Site Final | 8/24/2015 | 8/25/2015 | 8/25/2015 | A | PASS |
Andy J. Long
|
|
|
Exterior construction and site improvements are complete. Landscaping has been installed, streets, and gutters have been swept. DI bags in stormdrains surround building have been removed.
ESC permit conditions satisfied. Permit finaled.
|
DOC - Permit Finaled | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/24/2015 | 8/24/2015 | 8/24/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/7/2015 | 8/7/2015 | 8/7/2015 | | PASS |
Evan Jenkins
|
|
|
Project Near Completion Minor sidewalk work occuring. Mainly re-vegetated via landscaping. No ESC issues observed at time of inspection
|
General Inspection | 7/23/2015 | 7/23/2015 | 7/23/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: on interior and exterior. No violations observed at time of inspection
|
General Inspection | 7/8/2015 | 7/8/2015 | 7/8/2015 | | PASS |
Andy J. Long
|
|
|
Resurfacing roads and installing new curb and gutter. No discharges offsite and dust is staying within construction area. WIP.
|
General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 | | PASS |
Andy J. Long
|
|
|
Building shell for the Vista West apartment complex is complete and exterior painting, interior work, sidewalks and curbing, and irrigation are in progress. Streets are free of significant amounts of dirt and no muddy trackout. No washout or liquid spills observed on site or in proximity of MS4 DIs, which have sediment filter bags installed.
WIP. No corrections at this time.
|
General Inspection | 6/8/2015 | 6/8/2015 | 6/8/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/22/2015 | 5/22/2015 | 5/22/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no issues at this time
|
General Inspection | 5/7/2015 | 5/7/2015 | 5/7/2015 | | PASS |
Andy J. Long
|
|
|
Site perimeter is clean, no trackout from site and materials and sediment are being kept within the curbed areas and away from areas where they are transported by runoff. Permit is posted. No corrections at this time.
|
General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 | | PASS |
Andy J. Long
|
|
|
Streets and gutters surrounding complex (the Vista West) are free of trackout, spills, and sediment. DI bags have filter bag protection. Lined pit is being used for washout. No corrections needed.
Note - RP Tony no longer with ESI
|
General Inspection | 4/7/2015 | 4/7/2015 | 4/7/2015 | | PASS |
Andy J. Long
|
|
|
Site perimeter is clean and free of trackout or loose sediment accumulations. WIP on interior - exterior not yet stabilized but controlled access have prevented trackout. No discharges or spills observed. Permit is posted.
|
Random Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PART |
Andy J. Long
|
|
|
WIP. No significant trackout observed, no discharges or spill in or around site and gutters are relatively clean.
1 correction: Do maintenance on all storm drain drop inlets. In particular the inlet on Dale and Island needs to be fitted with an alternative BMP because of its irregular shape.
|
General Inspection | 3/9/2015 | 3/9/2015 | 3/9/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Construction entrance has been turned over. No ESC issues at this time
|
General Inspection | 2/20/2015 | 2/20/2015 | 2/20/2015 | | PART |
Andy J. Long
|
|
|
No trackout, streets recently swept, no discharges or runoff at time of inspection. All adajacent drop inlet have filter bag protection.
Need to reinstall flter bag on inlet at Dale and Island so that the fabric protects the entire inlet.
|
General Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 | | PASS |
Andy J. Long
|
|
|
Drop inlets have filter protection. Trackout is being controlled. Vertical construction in progress. No corrections at this time.
|
General Inspection | 1/21/2015 | 1/21/2015 | 1/21/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no ESC issues at this time
|
General Inspection | 1/6/2015 | 1/6/2015 | 1/6/2015 | | PASS |
Andy J. Long
|
|
|
Site is surrounded by pre-existing curbing to the north, west, and east that is above grade of the disturbed dirt and containing sediment and runoff. Perimeter wattle protects the remaining site. DIs have inlet protect, no stormwater or non-stormwater discharges occuring at time of inspection (much of site is frozen) . Permit posted, no violations observed.
|
General Inspection | 12/19/2014 | 12/19/2014 | 12/19/2014 | | PASS |
Andy J. Long
|
|
|
All drop inlets protected, no significant trackout to surrounding streets. Lined concrete washout onsite. No offsite or non-stormwater discharges. Permit posted. Sherwood Apt. complex currently in compliance.
|
General Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | | PASS |
Andy J. Long
|
|
|
No discharges observed. DIs have sediment protection. No significant trackout. Due to flatness of site and lack of gutters, there is some ponding along the street and the site.
No corrections at this time.
|
General Inspection | 11/19/2014 | 11/19/2014 | 11/19/2014 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 11/4/2014 | 11/4/2014 | 11/4/2014 | A | PART |
Andy J. Long
|
|
|
Some areas of the perimeter are lacking wattles or containment where the grade of the curbing is below the disturbed areas. Many areas have been left undisturbed as a BMP. Need to assess areas where wattles or other BMP may be installed.
No major trackout at site, DI bags have filter protection, and lined washouts are being utilized.
Note: dewatering project by Owyhee Construction is covered under ESC14-01039
|
General Inspection | 10/21/2014 | 10/21/2014 | 10/21/2014 | | PASS |
Andy J. Long
|
|
|
Sherwood Apartments in good condition. Receivign drop inlets have protection, site has perimeter controls where dirt area is above grade of street. Constuction entrance and lined concrete washout provided. Permit and SWPPP are on site.
Approved.
|
General Inspection | 10/3/2014 | 10/3/2014 | 10/3/2014 | | PASS |
Evan Jenkins
|
|
|
Inspector Module didn't enter my report I performed earlier. During Inspection, minor trackout was occuring. Told RP to get it swept up by the end of the day.
|
General Inspection | 9/18/2014 | 9/18/2014 | 9/18/2014 | | PART |
Andy J. Long
|
|
|
All surrounding storm drains have inlet protection with remaining capacity. No trackout.
Two corrections:
1. Sweep up curbs and shoulders of roads surrounding site. Some dirt and construction gravel has accumulated.
2. Empty south end concrete washout. (note: there is an empty lined washout on the east end of site on La Pointe that is ready for use).
|
General Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 | | PASS |
Evan Jenkins
|
|
|
no track out of any other esc issues at time of inspection
|
Random Inspection | 8/11/2014 | 8/11/2014 | 8/11/2014 | P | PASS |
Andy J. Long
|
|
|
West Sherwood Apts swepts Lapointe, Royal, and Sherwood streets around site. Perimeter has wattles installed where ground is above existing curbing. No track out observed. Permit posted at entrance; SWPPP on site..
|
General Inspection | 7/30/2014 | 7/30/2014 | 7/30/2014 | | PART |
Andy J. Long
|
|
|
Sherwood Apts. in the Lusk district is working on first floor. All surrounding DI's have protection. At the moment there is utility work and road patching occuring so trackout is hard to assess.
No discharges, excessive dust observed.
Correction:
When road work is complete, the gutters around the site should be swept to remove sediment and gravel that has collected.
|
General Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 | | PASS |
Andy J. Long
|
|
|
WIP on footings and foundation. All surrounding DIs are protected, two construction entrances, and large lined washout onsite and being utilized. No corrections required.
|