General Inspection | 12/15/2014 | 12/15/2014 | 12/15/2014 | | PASS |
Andy J. Long
|
|
|
Owyhee Terrace repaving project complete. Grassy stormwater drainage swales are also complete. No disturbed area or loose sediment on site. ESC conditions satisfied.
|
DOC - Permit Finaled | 12/15/2014 | 12/15/2014 | 12/15/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/14/2014 | 10/14/2014 | 10/14/2014 | | PASS |
Andy J. Long
|
|
|
Majority of paving/resurfacing work is complete and site is stabilized. WIP on a drainage swale midway through complex. No corrections at this time.
|
General Inspection | 8/12/2014 | 8/12/2014 | 8/12/2014 | | PASS |
Evan Jenkins
|
|
|
work ongoing vegetation re-establishment needs to occur along owyhee
|
Site Preparation | 6/10/2014 | 6/10/2014 | 6/10/2014 | P | PASS |
Andy J. Long
|
|
|
Jamie Phone #: ###-####
See general inspection notes. Discussed project with Jamie for CA Paving. Project is approved to continue.
|
General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 | | PASS |
Andy J. Long
|
|
|
Owyhee Terraces private lane repaving project is in project. Permit posted at front entrance off Owyhee St. Breaking asphalt into chunks and hauling. Working in phases. No discharges or sediment issues observed. All drainage to grassy swales.
|