Site Final | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 1/1/2015 | 1/1/2015 | 1/2/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 | | PASS |
Andy J. Long
|
|
|
Village Chaton 4-plex in progrgress. Frame and sidewalks installed, working on interior. See ESC14-00086 for subdivision inspection notes. Individual units (4) are in compliance.
|
General Inspection | 10/31/2014 | 10/31/2014 | 10/31/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 8/26/2014 | 8/27/2014 | 8/27/2014 | A | FAIL |
Evan Jenkins
|
|
|
Dave Phone #: ###-#### Mass Grading and Foundation Pouring/Prep is occuring prior to site prep inspection approval. Concrete Washout of is completely full, overflowing onto the ground. Permits need to be posted on each individual lot. Dave Skaggs has not returned both phone call attemps.
|