General Inspection | 4/20/2015 | 4/20/2015 | 4/20/2015 | | PASS |
Andy J. Long
|
|
|
4-plex complete and occupied. Open areas in Village Chaton are landscaped. All ESC permits finaled except ESC14-00086 (subdivision main ESC permit) and ESC15-00115 (carports). Will final permits once carports complete and DI bags pulled/all remaining sediment in parking lot swept.
|
DOC - Permit Finaled | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/3/2015 | 3/3/2015 | 3/3/2015 | | PART |
Evan Jenkins
|
|
|
Drop inlet needs to be cleaned out. Project is near completion. Re-vegetation is currently taking place via landscaping/sod.
|
General Inspection | 1/16/2015 | 1/16/2015 | 1/16/2015 | | PART |
Andy J. Long
|
|
|
All 4 Village Chaton 4-plexes have been framed. Parking lot and utilities are installed. Interior work is ongoing.
Trash is contained, onsite stormdrain have inlet protection. MS4 DI on Ustick also has filter bag installed. No significant trackout, but site is not yet landscape some sediment is being eroded away.
Need to install wattle along disturbed area next to the sidewalk on Ustick (west side of access road)
|
General Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 | | PASS |
Andy J. Long
|
|
|
Village Chaton 4-plex in progrgress. Frame and sidewalks installed, working on interior. See ESC14-00086 for subdivision inspection notes. Individual units (4) are in compliance.
|
General Inspection | 10/15/2014 | 10/15/2014 | 10/15/2014 | | PART |
Evan Jenkins
|
|
|
contractor still working on cleanup of trackout
|
Site Preparation | 8/26/2014 | 8/27/2014 | 8/27/2014 | A | FAIL |
Evan Jenkins
|
|
|
Dave Phone #: ###-#### Mass Grading and Foundation Pouring/Prep is occuring prior to site prep inspection approval. Concrete Washout of is completely full, overflowing onto the ground. Permits need to be posted on each individual lot. Dave Skaggs has not returned both phone call attemps.
|