Permit Information
Permit NumberESC14-00266
StatusFinaled
Name DYLAN SCHNEIDER
Site Address 555 W PASO FINO DR
Project NameHackberry Ranch Lot 12 Blck 1
Customer Number 
ePlanReviewNo
Description
ESC plan and narrative submitted. Contractor shall retain copy for use on site. Construction and material loading access must be provided to reduce trackout to Paso Fino. Other BMPs include perimeter wattles and liquid waste washout. Site preparation inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/5/20158/5/20158/5/2015 PASS
DetailsAndy J. Long
Construction and landscaping has been complete for several months and yard is landscaped. Hillside that was disturbed and re-seeded is now fully vegetated to meet ESC permit requirements. Perimeter temp BMPs have been removed.

ESC permit finaled.
DOC - Permit Finaled8/5/20158/5/20158/5/2015PPASS
DetailsAndy J. Long
General Inspection7/21/20157/21/20157/21/2015 PASS
DetailsAndy J. Long
no issues. Slope near full revegetation. Will verify and close next general inspection if ready.
General Inspection7/6/20157/6/20157/6/2015 PASS
DetailsAndy J. Long
Slope revegetating. No issues.
General Inspection6/19/20156/19/20156/19/2015 PEND
DetailsAndy J. Long
Surrounding hillside areas disturbed during construction in process of revegetating. No hillside bond opened yet. BLD open. No ESC corrections at this time.
General Inspection6/4/20156/4/20156/4/2015 PEND
DetailsEvan Jenkins
Landscaping/sodding is currently taking place along sides of SFD and backyard
No ESC issues at this time
Random Inspection5/20/20155/20/20155/20/2015AFAIL
DetailsEvan Jenkins
Large Stockpile of gravel in ACHD's ROW blocking traffic
Contacted Dylan via cellphone and described that the large gravel pile needs to be removed, due to blocking half of Paso Fino Dr. causing obstructions, safety hazards and Obtainnig NO Obstruction Permit through ACHD. He stated he will contact his landscapers to have stockpile removed immediately.
General Inspection5/12/20155/12/20155/12/2015 PASS
DetailsAndy J. Long
Final landscapinng and stabilization in progress. Project near completion. Will need to remove any temporary BMPs behind home that are unused. No violations occuring.
General Inspection4/27/20154/27/20154/27/2015 PASS
DetailsEvan Jenkins
Overall, the subdivision looks good. Majority of area is stabilized. Permit is close to being finaled out. A few vacant lots remain
General Inspection4/10/20154/10/20154/10/2015 PASS
DetailsEvan Jenkins
General Inspection3/26/20153/26/20153/26/2015 PASS
DetailsEvan Jenkins
WIP: no ESC issues at this time
Final stabilization needs to take place
General Inspection3/11/20153/11/20153/11/2015 PASS
DetailsEvan Jenkins
Electrical work in progress. Downslope waddles are in good shape. No discharges occuring at this time
General Inspection2/24/20152/24/20152/24/2015 PASS
DetailsAndy J. Long
Project near completion. No trackout or sediment leaving site. Rear perimeter silt fence is in good condition and trenched in. No corrections.
General Inspection2/9/20152/9/20152/9/2015 PEND
DetailsAndy J. Long
WIP. Near completion. Not yet landscaped/stabilized; perimeter sediment controls are installed.

Builder will need to assist Hackberry Ranch developer with downstream inlet filter bag maintenance when getting finaled out.
BMP Violation1/21/20151/23/20151/22/2015ACANC
DetailsAndy J. Long
data entry error
General Inspection1/21/20151/21/20151/21/2015 PASS
DetailsAndy J. Long
WIP. BMPs installed. No corrections at this time.
General Inspection1/6/20151/6/20151/6/2015 PASS
DetailsEvan Jenkins
General Inspection12/22/201412/22/201412/22/2014 PASS
DetailsEvan Jenkins
work in progress. some minor rilling had occured over the weekend storm. no discharge offsite observed. Contractor is currently shoveling/sweeping road where equipment had driving on and off lot
General Inspection12/5/201412/5/201412/5/2014 PASS
DetailsAndy J. Long
Site is in good condition. Straw wattles installed at bottom of slope and also at earthen berm. No significant trackour or sediment runoff. Trash & materials are consolidated. Permit posted.
General Inspection11/20/201411/20/201411/20/2014 PASS
DetailsEvan Jenkins
no activity at time of inspection. no esc issues at this time
Random Inspection11/5/201411/5/201411/5/2014APART
DetailsAndy J. Long
Permit posted. No sediment or trackout from site onto Paso Fino. Gator guard wattles installed at bottom of hill have captured a lot of mud and sand and prevented blowout to next site.

1 correction:

Need to perform maintenance on the wattles by removing the collected and restaking the wattles.

Notified RP/GC via telephone regarding the correction
General Inspection10/22/201410/22/201410/22/2014 PASS
DetailsAndy J. Long
Construction is ongoing. Downslope sediment controls are properly installed with no deficiencies. No trackout or sediment in gutter/street. Permit is posted and trash is contained.

No corrections required.
General Inspection10/7/201410/7/201410/7/2014 PASS
DetailsEvan Jenkins
no trackout observed. Currently a man is sweeping the curbs with a push broom. no esc issues at this time
General Inspection9/3/20149/3/20149/3/2014 PASS
DetailsAndy J. Long
WIP. Permit is posted and hillside BMPs installed. No sediment runoff or other violations observed. Paso Fino street looks good.
General Inspection7/31/20148/1/20148/1/2014APASS
DetailsAndy J. Long
Sidewalks clean, BMPs installed, trash contained. Site is in compliance.
General Inspection7/31/20147/31/20147/31/2014 CANC
DetailsAndy J. Long
Rescheduled for 8-1
General Inspection6/27/20146/30/20146/30/2014APART
DetailsAndy J. Long
Follow up inspection from Friday CN issued:

Corrections made:
1. Concrete washout that was full was cleaned up.
2. Trash has been cleaned up. No new container on site yet.

Workers grading front with bobcat and creating trackout onto street and sidewalk.. Requested that they sweep at end of the day, which they agreed to.
General Inspection6/27/20146/27/20146/27/2014 FAIL
DetailsAndy J. Long
Corrections required:

1. Sweep sidewalk and gutter since construction access has been buried.
2. Provide more capacity for concrete washout.
3. Provide new trash container. Currently just a pile of trash and wood scraps.

Verbal correction request issued to RP Dylan. He agreed to make corrections ASAP. Site has typically been in compliance.
Site Preparation5/20/20145/21/20145/21/2014APASS
DetailsAndy J. Long
Dillon Phone #: ###-####



Permit posted, approved plans and ESC narrative on site. BMPs installed include downslope wattles, stabilized access, and concrete washout. Stormwater infrastructure has existing inlet protection.

Approved.