General Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 | | PASS |
Andy J. Long
|
|
|
Landscaping and stabilization complete. Temp BMPs removed and perimeter areas of yard have had tacifier and seed applied. ESC permit conditions satisfied.
|
DOC - Permit Finaled | 6/25/2015 | 6/25/2015 | 6/25/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/10/2015 | 6/10/2015 | 6/10/2015 | | PEND |
Evan Jenkins
|
|
|
Ground FX is currently blowing bark around the SFD. Landscaping still in progress but near completion. No ESC issues at this time
|
General Inspection | 5/26/2015 | 5/26/2015 | 5/26/2015 | | PEND |
Evan Jenkins
|
|
|
landscaping is occuring. waiting for perm re-vegetation to be established
|
General Inspection | 5/11/2015 | 5/11/2015 | 5/11/2015 | | PASS |
Andy J. Long
|
|
|
Home construction complete. WIP on irrigation lines for yard and landscaping. Fence around back is already installed. Hillside vegetation was preserved well and soil is stabilized. Should be ready for final once landscaped and temp BMPs removed (wattles)
|
General Inspection | 4/24/2015 | 4/24/2015 | 4/24/2015 | | PASS |
Evan Jenkins
|
|
|
Interior WIP: Perminant vegetation needs to be established. No ESC issues at this time
|
General Inspection | 4/9/2015 | 4/9/2015 | 4/9/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues at this time. Permit posted
|
General Inspection | 3/10/2015 | 3/10/2015 | 3/10/2015 | | PASS |
Evan Jenkins
|
|
|
Home near complete large stockpile of dirt in backyard. It appears to be topsoil for landscaping/sod for perm stabilization no esc issues at this time
|
General Inspection | 2/20/2015 | 2/23/2015 | 2/24/2015 | A | PASS |
Andy J. Long
|
|
|
WIP on interior. Site is fully graded but yard/landscaping is not installed. Perimeter BMPs include earthen berm and trenched in straw wattles. Will need to secure slope running towards lot to the north during landscaping.
|
General Inspection | 2/20/2015 | 2/20/2015 | 2/20/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 | | PASS |
Andy J. Long
|
|
|
Hillside BMPS installed. WIP. No trackout, material spills or discharges observed. Project near completion.
|
General Inspection | 1/21/2015 | 1/21/2015 | 1/21/2015 | | PASS |
Andy J. Long
|
|
|
Permit posted. BMPs installed. No hillside erosion occuring around site. No corrections at this time. Paso Fino has a lot of winter safety sand on roadway.
|
General Inspection | 1/6/2015 | 1/6/2015 | 1/6/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/22/2014 | 12/22/2014 | 12/22/2014 | | PASS |
Evan Jenkins
|
|
|
WIP: minor rilling had occured but BMP's are in good shape at this time. No offisite discharge has been observed at time of inspection. Contractor is currently sweeping/shoveling trackout from a piece of equipment driving on & off wet lot to stage building materials. no major ESC issues at this time, and contractor is currently cleaning
|
General Inspection | 12/5/2014 | 12/5/2014 | 12/5/2014 | | PASS |
Andy J. Long
|
|
|
SFH near completion. Hillside BMPS installed. No violations, no corrections at this time.
|
General Inspection | 11/20/2014 | 11/20/2014 | 11/20/2014 | | PASS |
Evan Jenkins
|
|
|
No activity at this time. no esc issues right now
|
General Inspection | 11/5/2014 | 11/5/2014 | 11/5/2014 | | PART |
Andy J. Long
|
|
|
No trackout or sediment exiting site via the street. Permit is posted and trash contained, vegetatve buffer has been maintained.
1 correction: -Do maintenance on down slope wattle to clear out some mud and allow for more capacity to capture sediment in future events.
Called RP to inform of correction
|
General Inspection | 10/21/2014 | 10/21/2014 | 10/22/2014 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 10/6/2014 | 10/6/2014 | 10/6/2014 | P | PASS |
Andy J. Long
|
|
|
Phone #: 8674587 >> Inspection requested via mobile web by Scott
No excavation started at site prior to site prep inspection request. Permit is posted, perimeter wattles installed around site and staked in. Hillside lot has been graded flat during sub development. Rock used for driveway prep will be used instead of construction entrance rock in addition to regular sweeping on street and sidewalk. Approved.
|
General Inspection | 10/1/2014 | 10/1/2014 | 10/1/2014 | | PASS |
Evan Jenkins
|
|
|
WIP No ESC Issues at this time
|