Site Final | 10/21/2015 | 10/21/2015 | 10/21/2015 | P | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 10/21/2015 | 10/21/2015 | 10/21/2015 | P | PASS |
Jim Storey
|
|
|
|
Aging Inspection | 10/16/2015 | 10/16/2015 | 10/16/2015 | | PASS |
Evan Jenkins
|
|
|
No ESC issues observed at this time
|
Random Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. Permit sign posted. Sidewalk and gutter in front of house do not have trackout or sediment runoff. Lined concrete washout was used for foundation work, and is located on back of lot next to ally. Approved.
|
Site Preparation | 5/6/2015 | 5/7/2015 | 5/7/2015 | A | PASS |
Evan Jenkins
|
|
|
Robert Phone #: ###-####
Permit posted in front of lot on metat post: Existing concrete washout from previous townhome construction. Lot is extremely flat, and at a lower elevation than other lots. Approved to begin construction
|