DOC - Permit Finaled | 9/2/2014 | 9/2/2014 | 9/2/2014 | A | PASS |
Andy J. Long
|
|
|
House is complete, landscaping and driveway are complete. BLD finaled. Site has been cleaned of sediment and construction materials.
|
Complaint Inspection | 7/29/2014 | 7/29/2014 | 7/29/2014 | P | FAIL |
Andy J. Long
|
|
|
trackout complaint
Some trackout directly in front of driveway which is currently being installed.
Corrections: 1. Sweep Wright Street in front of driveway. 2. Remove stockpile of rocks that is in the right-of-way.
|
Tracking Control | 5/22/2014 | 5/22/2014 | 5/22/2014 | P | PART |
Andy J. Long
|
|
|
Dirt stockpiles have been backfilled. Some minor activity. No major trackout but the sweeping job was not very good. Need to re-sweep and have broom on site.
Will notify RP.
|
Complaint Inspection | 5/21/2014 | 5/21/2014 | 5/21/2014 | P | PART |
Andy J. Long
|
|
|
Received complaint about ESC issues, noise, and parking issues at site:
No activity at time of inspection. Trench work for sewer/water utilities was not properly cleaned up at end of day yesterday. There is very limited space where driveway goes to parcel it should be noted.
Observations:
Some dirt tracked onto to the street from stockpiling/trenching activities. No major trackout beyond entrance to site; No trash or other construction debris/material uncontained.
Permit posted.
Correction Notice posted; discussed corrections with RP Vince on phone.
Corrections:
1. Sweep up at end of each day or more as necessary.
2. Construction hours 6:30 AM-6:00 PM MF, 8:30-6 PM weekends.
3. Install watte or silt fence to protect neighbor's grass.
Due Thursday 5/22/2014 at 12 PM
|
Site Preparation | 5/13/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Andy J. Long
|
|
|
Vince Phone #: ###-####
Met RP on site. BMPs include stabilized contruction entrance and street sweeping as necessary. Permit is posted. No MS4 infrastructure in area. Low risk site. Approved.
|