General Inspection | 4/10/2015 | 4/10/2015 | 4/10/2015 | | PASS |
Andy J. Long
|
|
|
Landscaping crews finalizing tree and shrub installed. Slopes onsite have be hydroseeded with tacifier. Hillside vegetation bond has been settled. ESC permit conditions satisfied, no issues, permit finaled.
|
DOC - Permit Finaled | 4/10/2015 | 4/10/2015 | 4/10/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/26/2015 | 3/26/2015 | 3/26/2015 | | PASS |
Andy J. Long
|
|
|
No hillside vegetation established yet. Need to hydroseed or landscape. Home is occupied, with bond out for vegetation/site restoration.
|
General Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 | | PASS |
Andy J. Long
|
|
|
Home is occupied and construction complete. Permit is open to monitor landscaping and hillside revegetation that is not yet complete.
|
General Inspection | 2/24/2015 | 2/24/2015 | 2/24/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/9/2015 | 2/9/2015 | 2/9/2015 | | PASS |
Evan Jenkins
|
|
|
Temporary BMP's in place. Disturbed hillsides need to be perminantly stabilzed
|
General Inspection | 1/23/2015 | 1/23/2015 | 1/23/2015 | | PASS |
Andy J. Long
|
|
|
No changes or activity at site. Hillside SFH unlandscaped. Permit open for revegetation. No corrections needed.
|
General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 | | PASS |
Andy J. Long
|
|
|
Home complete. Permit open for revegetation. No ESC violations observed.
|
General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 | | PASS |
Andy J. Long
|
|
|
Occupied. Still needs revegetation. BLD already finaled. no corrections. DI still installed.
|
General Inspection | 12/9/2014 | 12/9/2014 | 12/9/2014 | | PEND |
Andy J. Long
|
|
|
BLD finaled and home is occupied. Bond issued for hillside revegetation through Hillside Ordinance.
Need to cleanup remaining materials at end of driveway and explain landscaping/revegetation schedule.
|
General Inspection | 11/24/2014 | 11/24/2014 | 11/24/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout to culdesdac. Site not yet landscaped/stabilized but vegetative barrier has been preserved. No corrections
|
General Inspection | 11/6/2014 | 11/6/2014 | 11/6/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted. Dried out stucco waste has been cleaned. No trackout to culdesac and the vegetative perimeter buffer has been maintained. No corrections at this time.
|
General Inspection | 10/22/2014 | 10/22/2014 | 10/22/2014 | | PASS |
Andy J. Long
|
|
|
No ESC issues at time but some hillside areas along the driveway are not yet stabilzed. Will keep ESC permit open to monitor progress.
|
General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 | | PART |
Andy J. Long
|
|
|
Permit posted and very little trackout. Site is surrounded by the natural vegetation which been preseved.
Stucco crew did not use a lined washout and has washed out in numerous places with some flow off the bottom end of site. The slurry is now dry, but I requested clean up and provision of more washout if necessary and will discuss BMPs for future projects.
|
General Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted. Downslope vegetative area has been preserved. No rill erosion has formed and limits of disturbance are containing loosed dirt.
No corrections required at this time.
|
General Inspection | 7/17/2014 | 7/17/2014 | 7/17/2014 | | PART |
Andy J. Long
|
|
|
No hillside erosion or other issues. Permit posted.
There is some minor track out to the culdesac. Called RP Brian Murphy and gave a verbal correction notice to have it swept before end of the week.
|
Random Inspection | 6/2/2014 | 6/2/2014 | 6/2/2014 | P | PASS |
Andy J. Long
|
|
|
Driveway approach has been graded and foundation excavated with concrete forms in place but no concrete poured. Walked downslope of project and disturbed dirt is surrounded by vegetative buffer. Permit posted, DI protected. No corrections.
|
Site Preparation | 5/16/2014 | 5/16/2014 | 5/16/2014 | P | PASS |
Andy J. Long
|
|
|
Bryan Phone #: ###-####
Met RP Bryan on site and discussed phases. First phase is to construct the grade for the driveway. A silt fence has been placed on the downhill side of the rough graded driveway. After this is complete, further BMPs may be required once home construction begins. Drop inlet will have protection and a road mix access. Permit posted, site is ready for action.
|