Permit Information
Permit NumberESC14-00328
StatusFinaled
Name SHANE HOPKINS
Site Address 4623 W WILLOW LN
Project NameWillowLane wetlands project
Customer Number 
ePlanReviewNo
Description
Wetlands restoration project at Willow Lane wetlands mitigation bank. Will remove existing soil, and provide new top soil to plant wetlands vegetation (willows, cottonwoods, and grasses). Boise River is seperated from area of disturbance by earthen berm and vegetation but the ESC plan calls for wattles along the length of the project area. Other BMPs include stablized construction entrance and designated topsoil stockpile area in parking lot with perimeter controls. Contractor is Western Idaho Construction & Landscape/ RP is with the Wetlands Group. Site prep inspecton is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/16/201511/16/201511/16/2015 PASS
DetailsAndy J. Long
Spoke with Wetlands Group' Shane Hopkins regarding project. Tree replanting and minor grading activity is complete. Stockpile of soil at edge of Willow Lane parking lot will be utilized and maintained by Boise Parks and Recreation under their Annual ESC permit ( ESC15-00590 valid May 2015 - 2016) No sediment runoff or storage of construction materials is occuring at site, stockpile has perimeter sediment control.
DOC - Permit Finaled11/16/201511/16/201511/16/2015PPASS
DetailsAndy J. Long
General Inspection10/30/201510/30/201510/30/2015 CANC
DetailsAndy J. Long
General Inspection10/15/201510/15/201510/15/2015 PEND
DetailsEvan Jenkins
General Inspection9/30/20159/30/20159/30/2015 PEND
DetailsAndy J. Long
No changes at site. Stock piles are stabile. Project is on hold
General Inspection9/15/20159/15/20159/15/2015 CANC
DetailsAndy J. Long
General Inspection8/31/20158/31/20158/31/2015 FAIL
DetailsEvan Jenkins
remove temp bmp's
General Inspection8/14/20158/14/20158/14/2015 CANC
DetailsAndy J. Long
General Inspection7/30/20157/30/20157/30/2015 CANC
DetailsEvan Jenkins
General Inspection7/15/20157/15/20157/15/2015 FAIL
DetailsEvan Jenkins
Remove Temp BMP's around vegetated stockpiles
General Inspection6/30/20156/30/20156/30/2015 FAIL
DetailsEvan Jenkins
General Inspection6/15/20156/15/20156/15/2015 FAIL
DetailsEvan Jenkins
Will be contacting Public Works about pulling Bond Money (from permit/project) from The Wetland Group to get stockpiles and Temporary BMP's removed, due to lack of action and response from RP Shane Hopkins and The Wetlands Group. There has been multiple inspections, contacting them with no action/response from the Group.
General Inspection5/29/20155/29/20155/29/2015 PEND
DetailsEvan Jenkins
No change. Contacted Shawn again. He stated he forgot about it and will get back to me. If I don't hear anything back, I will pursue getting their bond to have these issues fixed.
General Inspection5/14/20155/14/20155/14/2015 PEND
DetailsEvan Jenkins
Talked with Shane from the Wetland Group pertaining to the 3 large stockpiles left behind from the project (which are fully vegetated with a compost waddles around each stockpile). He stated he was sure but would call around then email me back what he finds out.
No issues at this time
General Inspection4/29/20154/29/20154/29/2015 PASS
DetailsEvan Jenkins
General Inspection4/14/20154/14/20154/14/2015 PASS
DetailsEvan Jenkins
No Activity. Site is in same condition as prior inspections
General Inspection3/30/20153/30/20153/30/2015 PASS
DetailsEvan Jenkins
No Activity
Vegetation is beggining to grow on stockpiles
General Inspection3/13/20153/13/20153/13/2015 PASS
DetailsEvan Jenkins
No activity
stockpiles still onsite
General Inspection2/26/20152/26/20152/26/2015 PASS
DetailsEvan Jenkins
BMP's still in place around large stockpiles. vegetation still hasn't occured or been established
General Inspection2/10/20152/11/20152/11/2015PPASS
DetailsAndy J. Long
No activity or equipment on site. Stockpiles have perimeter fiber wattles installed. Need to determine if project will resume in the Spring. No issues at site.
Site Preparation2/10/20152/11/20152/10/2015ACANC
DetailsAndy J. Long
data entry error
General Inspection2/10/20152/10/20152/10/2015 CANC
DetailsAndy J. Long
rescheduled
General Inspection1/26/20151/26/20151/26/2015 PASS
DetailsEvan Jenkins
No Actiivty, No ESC Issues
General Inspection1/9/20151/9/20151/9/2015 PASS
DetailsEvan Jenkins
No activity occuring. Stockpiles and BMP's still in place
General Inspection12/25/201412/25/201412/26/2014 PASS
DetailsAndy J. Long
No activity. No changes at site.
General Inspection12/10/201412/10/201412/10/2014 PASS
DetailsEvan Jenkins
Stockpiles and BMP's still in place. no violations observed
General Inspection11/25/201411/25/201411/25/2014 PASS
DetailsEvan Jenkins
No activity occuring. Temp BMP's still in place around stockpiles
General Inspection11/10/201411/10/201411/10/2014 PASS
DetailsEvan Jenkins
No Activity. BMP's still in Place
General Inspection10/24/201410/24/201410/24/2014 PASS
DetailsEvan Jenkins
no activity
General Inspection10/8/201410/8/201410/8/2014 PASS
DetailsEvan Jenkins
no activity. BMP's still in place
General Inspection9/23/20149/23/20149/23/2014 PASS
DetailsAndy J. Long
No activity at Willow Lane wetlands project. Topsoil stockpiles are in position as indicated on ESC plan and are surrounded by fiber wattles for perimeter control and tops have been graded flat.

Some areas around the edge of the wetland basin area have been scraped/grubbed to remove old topsoil. Fiber wattle is installed at west end (outlet end) of wetland. Currently no water in the wetland. No corrections needed at site.
General Inspection9/5/20149/5/20149/5/2014 PASS
DetailsEvan Jenkins
No Activity
Status has not changed. BMP's still in place. Vegetation needs Re-established or stockpiles need to be removed
General Inspection8/21/20148/21/20148/21/2014 PASS
DetailsEvan Jenkins
stockpiles still here, with compost wattles around both. no vegetation growing on them.
no esc issues at this time
General Inspection8/5/20148/5/20148/5/2014 PASS
DetailsEvan Jenkins
General Inspection7/18/20147/18/20147/18/2014 PASS
DetailsEvan Jenkins
disturbed areas have been seeded
once vegetation grows, ESC permit shall be closed
General Inspection6/19/20146/19/20146/19/2014 PASS
DetailsEvan Jenkins
BMP's in place
No ESC Issues at time of inspection
General Inspection5/30/20145/30/20145/30/2014 PASS
DetailsEvan Jenkins
All stockpiles protected via waddles and stamped down.
No ESC Issues at time of inspection
Site Preparation4/29/20144/30/20144/30/2014APASS
DetailsEvan Jenkins
Brent Phone #: ###-####
Construction signage posted, swppp onsite
bmp's installed
site looks great