General Inspection | 5/11/2015 | 5/11/2015 | 5/11/2015 | | PASS |
Andy J. Long
|
|
|
All disturbed areas are revegetated/stabilized to ESC permit condition requirements. Work complete, all permits finaled. No corrective actions required.
|
DOC - Permit Finaled | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/9/2015 | 4/9/2015 | 4/9/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/9/2015 | 3/9/2015 | 3/10/2015 | | PASS |
Andy J. Long
|
|
|
Construction and landscaping complete at Ranch Market. Need to check to see if adjacent area is to be developed or needs stabilization, unclear is if it is part of the parcel.
No sediment runoff, discharges, or other issues.
|
General Inspection | 2/6/2015 | 2/6/2015 | 2/6/2015 | | PASS |
Andy J. Long
|
|
|
Ranch Market complete and in business. No discharges or trackout. Permit is open for all landscaping/stabilization to be completed.
|
General Inspection | 1/6/2015 | 1/6/2015 | 1/6/2015 | | PASS |
Andy J. Long
|
|
|
Ranch Market is open. Waiting to check that site is landscaped/stabilized but much is snow covered. No discharges or trackout. Will continue to monitor.
|
General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 | | PASS |
Andy J. Long
|
|
|
Ranch Market has interior work and landscaping remaining. Pavement, curbing, stormwater system, and fuel tanks are all installed. No trackout or sediment runoff from site. Approved.
|
General Inspection | 10/31/2014 | 10/31/2014 | 10/31/2014 | | PASS |
Evan Jenkins
|
|
|
|
Tracking Control | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | FAIL |
Andy J. Long
|
|
|
Trackout to Eckart due to failed construction entrance. Ranch Market is having cement trucks on site this week for parking lot and curb work. It should be noted that some vehicles for Lucky Harris sub have also been using the entrance and that the utility line project remove a portion of the initial entrance.
Verbal correction notice to RP Chuck to provide new construction entrance and clean up trackout to Eckart by end of the day/tommorrow AM. He agreed and said rock for the entrance has already been ordered.
I will request to Lucky Harris crew to not use the Ranch Market entrance, and to use their designated entrance to the south.
|
General Inspection | 9/5/2014 | 9/5/2014 | 9/5/2014 | | PASS |
Andy J. Long
|
|
|
Ranch Market is surrounded by Lucky Harris sub development but is utilizing the following BMPs: construction entrance, sweeping the greenbelt, lined concrete washout, and permit is posted. Approved.
|
General Inspection | 7/30/2014 | 7/30/2014 | 7/30/2014 | | PASS |
Andy J. Long
|
|
|
Ranch Market frame is now being erected. The fuel tanks and utilities have already been installed.
Permit is posted, construction entrance in good condition, concrete washout is provided. No sediment or discharges leaving the site.
Approved.
|
Random Inspection | 6/26/2014 | 6/26/2014 | 6/26/2014 | A | PASS |
Andy J. Long
|
|
|
Ranch Market is in progress and looks to be soon be installing USTs hence the large stockpile. It is not yet inactive, so no stabilization required. Construction entrance in good condition. Permit clearly posted.
|
Random Inspection | 5/27/2014 | 5/27/2014 | 5/27/2014 | A | PASS |
Andy J. Long
|
|
|
Ranch Market project is doing well to keep well within area of distubance. Construction access being utilized and in good condition, no trackout to Eckart observed. No dust issues at time of inspection. Permit clearly posted. Approved.
|
Site Preparation | 5/22/2014 | 5/22/2014 | 5/22/2014 | A | PASS |
Andy J. Long
|
|
|
Site prep meeting requested and approved. BMPs installed include stabilized construction access, lined concrete washout, designated staging/storage area, and plans to preserve sidewalk and vegetated buffer around site. Will have water truck on site during rough grading.
Met RP Chuck and developers on site. Permit is posted; site has filed for Low Erosivity Waiver so must finish before September or will need to file for CGP per EPA regulations.
|