Site Final | 3/13/2015 | 3/13/2015 | 3/13/2015 | A | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 3/13/2015 | 3/13/2015 | 3/13/2015 | P | PASS |
Jim Storey
|
|
|
|
Aging Inspection | 2/27/2015 | 2/27/2015 | 2/27/2015 | | PASS |
Andy J. Long
|
|
|
Townhome in Mill District square in progress. Permit posted. Alley way is clean and DI has witches hat filter bag installed.
Trash container needs to be emptied next week.
|
Random Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | FAIL |
Andy J. Long
|
|
|
Mill District Square townhome has staging site in the mud and a lot of trackout and loose dirt on the access talleyway. The DI bag for that alley stormdrain is full and dirty water entering system. No trackout to Eckart or Sawmill at this time, but needs cleaning.
Corrections: 1. Pick up/contain trash and siding scraps. 2. Consolidate materials or provide tracking pad to prevent creating more mud. 3. Empty or replace DI bag 4. Sweep street and post signage to keep contractors off mud
|
Site Preparation | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | PEND |
Andy J. Long
|
|
|
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards Inspection cancelled from web by: Joshua Edwards
Inspection canceled due to broken irrigation main line. Workers dug trench to contain water/sediment, though some has flowed to the DI in the alley.
Approved to continue with repairs and then construction, just need to post permit and do maintenance on the affected DI bag and sweep alley.
|