Permit Information
Permit NumberESC14-00356
StatusFinaled
Name SCOTT A YRIBAR
Site Address 727 N ASHTREE WAY
Project NameNorthridge sub #5 new SFH
Customer Number 
ePlanReviewNo
Description
As per ESC conditions, ESC site map and narrative submitted for foothill lot. BMPs listed include stabilized construction access, preservation of existing vegetation outside clearing limits, perimeter wattles between lot and existing home, fugitive dust control, and storm drain catch basin protection downstream from site. Must protect existing stormwater infiltration swale at south end of property. Schedule and pass ESC site prep inspection after setting up BMPs and before excavation 384-3802
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/15/20163/15/20163/17/2016 PASS
DetailsAndy J. Long
Yard landscaped, building materials removed as requested and DI bag on Ashtree was taken out. ESC permit conditions satisfied.

Approved.
DOC - Permit Finaled3/17/20163/17/20163/17/2016PPASS
DetailsAndy J. Long
Site Final2/29/20162/29/20163/1/2016PNR
DetailsAndy J. Long
Scott ###-####

Need to remove trash and building materials from adjacent lot. Stabilize disturbed area and remove DI bag
General Inspection2/25/20162/25/20162/25/2016 PEND
DetailsEvan Jenkins
establishment of perm vegetation
General Inspection2/10/20162/10/20162/10/2016 PASS
DetailsAndy J. Long
Home complete. Site revegetation in progress. No corrections needed.
General Inspection1/26/20161/26/20161/26/2016 PASS
DetailsAndy J. Long
Near completion. WIP on interior and not yet landscaped. No sediment or other construction materials leavings site.
General Inspection1/11/20161/11/20161/11/2016 CANC
DetailsAndy J. Long
General Inspection12/25/201512/25/201512/28/2015 CANC
DetailsAndy J. Long
Christmas holiday
General Inspection12/10/201512/10/201512/11/2015 PASS
DetailsAndy J. Long
General Inspection11/25/201511/25/201511/25/2015 PASS
DetailsAndy J. Long
WIP on interior. No trackout, no sediment leaving site.
General Inspection11/10/201511/10/201511/10/2015 PASS
DetailsAndy J. Long
General Inspection10/26/201510/26/201510/26/2015 PASS
DetailsAndy J. Long
WIP on interior. Trash and materials are contained, perimeter vegetation has been preserved. No trackout or discharges. Approved.
General Inspection10/9/201510/9/201510/12/2015 PASS
DetailsAndy J. Long
WIP on interior. No active earth work. No sediment runoff or significant trackout observed.

Trash and materials contained on site. Surround native vegetation has been preserved where possible. No corrections at this time, but will want to empty out the sediment bag at bottom of Ashtree soon, over 50% capacity.
General Inspection9/24/20159/24/20159/24/2015 PASS
DetailsAndy J. Long
General Inspection9/9/20159/9/20159/10/2015 PASS
DetailsAndy J. Long
General Inspection8/25/20158/25/20158/25/2015 PASS
DetailsAndy J. Long
WIP on SFH. No trackout or loose dirt leaving site. Staying within clearing limits. Trash and materials are contained. No corrections.
General Inspection8/10/20158/10/20158/10/2015 PASS
DetailsAndy J. Long
WIP. Frame is up. No trackout or discharges observed. Permit sign posted. Staying well within clearing limits to preserve existing vegetation.
General Inspection7/24/20157/24/20157/24/2015 PASS
DetailsAndy J. Long
WIP on frame. No earth moving activity, site is mostly stabilized around perimeter with BMPs installed.

No trackout or discharges, no windblown litter. Clean site.
General Inspection7/9/20157/9/20157/9/2015 PASS
DetailsAndy J. Long
Permit posted, activity remaining within limits of disturbance and preserving existing vegetation and rock features. No trackout or discharges. No activity at time of inspection.
General Inspection6/24/20156/24/20156/24/2015PPASS
DetailsAndy J. Long
No trackout or sediment leaving site. Limits of disturbance have not expanded to surrounding vegetation. Approved.
General Inspection6/12/20156/12/20156/12/2015 PASS
DetailsEvan Jenkins
General Inspection5/28/20155/28/20155/28/2015 PASS
DetailsEvan Jenkins
WIP: Framing is currently taking place. No ESC issues at this time
General Inspection5/13/20155/13/20155/13/2015 PASS
DetailsAndy J. Long
Foundation slab and driveway are now complete. Wattle protecting onsite swale from sediment is in good condition. Very clean site, keeping well with limits of disturbance. Permit sign is posted. No corrections required.
General Inspection4/28/20154/28/20154/28/2015PPASS
DetailsAndy J. Long
Permit posted. Swale still has perimeter sediment protection. Site has been kept clean throughout project. Approved.
General Inspection4/24/20154/24/20154/24/2015 PASS
DetailsEvan Jenkins
General Inspection4/9/20154/9/20154/9/2015PPASS
DetailsAndy J. Long
Dirt offhauling is finished for time being. Work is occuring to prep for foundation. No trackout, permit posted, construction entrance and sediment control BMPs are installed on stormwater infrastructurs (swale onsite, inlet on street)

Approved, no corrections necessary at this time.
General Inspection3/31/20153/31/20153/31/2015 PASS
DetailsAndy J. Long
WIP. Permit posted, construction entrance and wattles installed per ESC plan.

Still offhauling dirt and rock offsite. No significant trackout or other violations.
Site Preparation3/13/20153/16/20153/16/2015APASS
DetailsAndy J. Long
Please call ahead to meet onsite - Scott Phone #: ###-####

Pre-excavation meeting prior to earth disturbance. BMPs installed per ESC site map and include silt fence boundary and straw wattle protecting the drainage swale/french drain. Will protect existing vegetation on back slope.

Construction entrance will be installed after removal of approximately 800 yards of dirt stockpiled over time.

Permit posted. Approved to begin construction activity.