Site Final | 10/30/2014 | 10/30/2014 | 10/30/2014 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/30/2014 | 10/30/2014 | 10/30/2014 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 7/10/2014 | 7/11/2014 | 7/11/2014 | A | PASS |
Andy J. Long
|
|
|
Grant Kolnes Phone #: ###-####
Spoke with RP/GC on phone regarding ESC conditions. Permit posted, lined washout installed. Lot is below grade of street, no surface water, and no MS4 infrastructure on Chester. Low risk. Approved. Construction to begin Monday.
|