Site Final | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Evan Jenkins
|
|
|
call when final completed - Eric Phone #: ###-#### See Final
|
DOC - Permit Finaled | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Evan Jenkins
|
|
|
This portion of the project is complete Surrounding areas have been vegetation via landscaping, and sidewalks poured. Each individual home will need seperate ESC Permit
|
General Inspection | 7/31/2014 | 7/31/2014 | 7/31/2014 | | PASS |
Evan Jenkins
|
|
|
no activity at time of inspection permit posted no esc issues
|
Site Preparation | 5/29/2014 | 5/30/2014 | 5/30/2014 | A | PASS |
Andy J. Long
|
|
|
Check on Vista Heights sub.
No activity. No MS4 in area. Permit is posted on south fence by the portapot. No corrections - currently no sidewalk, curbing or road.
|